Enquiries
Message
Home > Products > Other
Roller Conveyor Parcel Sorting Conveyor System Belt Conveyor
  • Roller Conveyor Parcel Sorting Conveyor System Belt Conveyor

Roller Conveyor Parcel Sorting Conveyor System Belt Conveyor

FOB Reference Price
Purchase quantity ()
Minimum order quantity
Payment
Meorient Import & Export  Co.LTD
Meorient Import & Export Co.LTD
China - Hangzhou
Trading Company
Trade Capacity
Export Percentage
Nearest Port
Hangzhou,Shanghai
Accepted Delivery Terms
Employees
5-10人
Accepted Payment Currency
USD,CNY
Average Lead Time
45 Day(s)
Certifications
Product Specifications
--
Product Description
Overview
Quick Details
Applicable Industries:
Manufacturing Plant, Logistics and warehouse
Showroom Location:
Mexico, Chile, South Africa
Condition:
New
Material:
Carbon Steel
Material Feature:
Heat Resistant
Structure:
Belt conveyor
Place of Origin:
Liaoning, China
Brand Name:
ETON
Voltage:
380V
Power:
0.55~2.2kw
Dimension(L*W*H):
Custom made
Warranty:
1 Year, According to model
Width or Diameter:
Other
Machinery Test Report:
Provided
Video outgoing-inspection:
Provided
Marketing Type:
Hot Product 2019
Warranty of core components:
1 Year
Core Components:
Other
Weight (KG):
50 kg
After-sales Service Provided:
Online support
Application:
Material handling and sorting for logistics and warehouse
Drive Type:
Chain
Conveying Medium:
Belt
Frame Material:
Carbon Steel
Surface Treatment:
Power coated
Load Capacity:
According to model
Production:
IN-HOUSE production
Style:
Logistics curve belt conveyor
Supply Ability
Supply Ability:
1000 Set/Sets per Month Material handing equipment curve belt conveyor for logistics and
Packaging & Delivery
Curve Conveyor

 

Application

 

Packing and Delivery

 

 

FAQ

Q1: What is the lead time for rollers?

A: We keep the material in stock and produce in house for quick delivery. Based on different ordering quantity and roller type, the lead time is about 5~15working days.

 

Q2: what is your payment terms?

A: The payment terms we accept is T/T or irrevocable L/C at sight, T/T preferred.

 

Q3: What is the lead time for rollers?

A: We keep the material in stock for standard rollers (Type listed on our website or catalog) and produce in house for quick delivery. Based on different ordering quantity and roller type, the lead time is about 5~15working days. The final lead time will be subject to each individual invoice.

 

Q4: What certification do you have?

A: We have ISO 9001:2008 certificate.

No desirable products?
Sourcing assistant>
How to start your business
  • Step 1
    Find your interested products by search keywords
  • Step 2
    Contact the supplier by clicking ”Enquire” or “request meeting” button, otherwise, you also could consult our import consultant.
  • Step 3
    After verifying your email, get response from suppliers or our trade manager will contact you as soon as possible
  • Step 4
    Set up meeting with the Chinese supplier without language barrier
Send Enquiry
ToLily Liu
Meorient Import & Export Co.LTD
Enquire
Popular Searches
lathersbuchertether.thermosatherosfortherusherfinetherhb thermfortherthoraether.thermoslocherfletcher