Product Name | Bucket teeth | Material | Carbon steel Boron steel 35mnB |
Technique | Forging Casting | Hardness | 48-54HRC |
Color | Yellow or Required | Packing | Wooden cases |
Delivery time | Within 30 days after contract establish | Warranty | 6-12Months |
Part No | 6Y0309 | Logo | SUNWIN or Required |
Brand | Model No | Part number | Weight | Brand | Model No | Part number | Weight | |||||||
Caterpillar | J200 | 1U3202TL | 1.30 | Komatsu | PC100 | LK100RC | 2.40 | |||||||
1U3202 | 1.30 | LK100 | 2.10 | |||||||||||
J250 | 1U3252RC | 3.00 | PC200 | 205-70-19570 | 3.90 | |||||||||
1U3252 | 2.70 | 205-70-19570RC | 5.40 | |||||||||||
1U1857 | 10.70 | PC300 | 207-70-14151 | 6.00 | ||||||||||
J300 | 1U3302 | 3.90 | 207-70-14151RC | 8.80 | ||||||||||
1U3302RC | 5.30 | 207-70-14151TL | 8.30 | |||||||||||
J350 | 1U3352 | 5.40 | PC400 | 207-70-14152TV | 12.30 | |||||||||
1U3352RC | 5.70 | 208-70-14152TL | 12.50 | |||||||||||
DAEWOO | DH130 | 2713-1221RC | 3.70 | HYUNDI | R200 | E161-3027RC | 4.90 | |||||||
2713-1221 | 3.70 | E161-3027 | 4.00 | |||||||||||
DH220 | 2713-1217RC | 5.50 | R220 | 61N6-31310 | 6.50 | |||||||||
2713-1217 | 5.40 | 61N6-31310RC | 6.90 | |||||||||||
DH300 | 2713-1219RC | 7.80 | R290 | E262-3046RC | 8.10 | |||||||||
2713-1219 | 7.60 | 61N8-31310GG | 9.20 | |||||||||||
DH360 | 2713-0032RC | 10.00 | 61N8-31310BG | 9.40 | ||||||||||
AND SO ON |
It is widely used in mining, civil engineering, electric power, water conservancy and national defense
Main Features
1) Excavation of building and plant foundations
2) Excavate the soil and strip the overburden of the quarry
3) Loading operations in quarries, tunnels, underground workshops and stowage yard
4) Digging channels, canals and dredging channels
5) After replacing the working device, pouring, lifting, installation, piling, rammed earth and other operations can be carried out
A: We are factory.
A: Generally it is 20-30 days if the goods are in stock. if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shipment.
If you have another question, pls feel free to contact us as below: