Cang Long Group was established in 2003.Our group owns the international market department, the domestic market department, the R &D department and tow group modernized Processing Center, covering the area reaches 450000 square meters, the production plant covering 228000 square meters. Products covering light steel structure, heavy steel structures, various models of color steel plate,meal deck, foam composite panels, rock wool composite panels,purification plates, C/Z steel, PU panels, purification plant, assembled concrete residential, light steel villas, container houses and other green building materials.At present, our products have been exported to more than 70 countries in the world, and have been widely recognized.
Our Workshop.
Our Team.
Fixed packing, loading, transportation, unloading the matters needing attention:
(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the
rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.
(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile
up securely, and to increase the necessary binding component loosening, prevent the loss.
(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.
(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.
(5) The member to the construction site, timely organization of unloading, stacking area.
(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.
1. Common type of the industrial building?
Reply: Portal frame is the usual type in the industrial workshop and warehouse shed. Other types also could be designed and manufacturer as per clients' request.
2. What's the quality grade of the steel structure components?
Reply: Q345 is used for main steel structure, Q235 is used for secondary steel structure.
3. How about the delivery time?
Reply: Usually,within 25-30 days after the order confirmed, also depends on the fabrication quantity.
4. How about the derust grade?
Reply: Ball blasting Sa2.5 on main steel structure;
manual derust St2.0 on secondary steel structure.
5. What is kind panel used for the roof and wall?
Reply: Color corrugated steel sheet and sandwich panel could be used. Sandwich panel performs well on the heat insulation,sound insulation.Common sandwich materials are EPS, glass wool and PU.
6. How to install it?
Reply: We will furnish you the detailed construction drawing and the construction manual which could help you to erect and install the building step by step. We also could send the engineer to your local to help you if neede
7. Maintenance:
Reply: Finish paint need be done after the frame installed, and do it again after 6-8 months. So the surface will stay more time.