Professional manufacturer extruding birds feather mill machine machinemaking machine production line
Introduction:
Feather meal can be widely used in livestock and poultry aquatic products such as high protein feed, protein content can be as high as 80%, amino acid composition is complete, its lysine, methionine is lower than imported fishmeal, the other trace elements are higher than fish meal, Acid content, ranking first in all natural feed, is a
very good protein feed resources.
Breeding poultry animals often encounter from the pecking or mutual pecking, pecking anus, pecking toe, pecking eggs and pecking fecal matter, are collectively known as pecking feather disease or pecking addiction. Pecking feather disease not only seriously affect its value, but also cause concurrent anemia, dermatitis, feathers vulnerable to fold, coat dark, and sometimes also cause parasitic breeding. Pecking feather disease and thus early prevention and treatment. Feather powder on this disease have a good therapeutic effect.
Technology processing( birds feather mill):
Feather dewater machine( birds feather mill)
Spiral extrusion works, the material pushed by the helical blade, so that the material and the shell wall of water seepage produce compression ratio, pushing forward the material from the outlet of the compression spring controlled discharge, seepage water from the bottom of the sink to collect shells connected by a drain discharge pipe.
Feather cutter( birds feather mill)
Long feather hair cut by hand into the machine at the inlet, through the nip belt and the conveyor belt to transport the interaction force feather cutter at (transport process will nip belt feather compacted to pie easy to cut off), and then by a cutter into small pieces 2-4cm, and then discharged from the discharge port.
feather extruder( birds feather mill)
Feather hair cut by a cutting machine after the feathers conveyor conveyor into the extruder into the inner discharge port, the conveyor motor is 0.75kw, frequency control. After the high temperature extrusion chamber through extrusion extruded into strips, then cut into small pieces by the cutting motor 2-4cm into the pneumatic conveying of the feed inlet means and then transported into and pulverized. Because Feathers puffed relatively higher temperature, typically around 130-150 degrees, so in the extrusion chamber will be provided with two sets of external electrical heating device auxiliary heating temperature of the heating device can be set on the electronic control box, general is about 120-150 degrees. expanded production capacity during the smoke and the smell of deodorant will enter into the tower exploded, dust through the air vents.
Deodorization tower( birds feather mill)
Deodorization tower fan inlet connection on feather puffing process produces smoke, dust, odor and deodorization tower through a pipe into the interior, through the internal filter, gas spraying device exploded after the top of the tower through the exhaust deodorization the air outlet, air vents will generally connected by pipes and outdoor, the gas discharge. Gas decomposition filtered air harmless; sprinkler head is provided with a plurality of helical deodorization tower, the dust and smoke filters and decompose water mist discharged through the pump and pipes, generally advise clients to build a water storage pool, about 2 cubic meters in capacity, we need to add a small amount of alkaline chemicals in it such as NaOH for neutralization. The water used after the re-discharged into the drain by recycling within the reservoir. Loss due to alkaline substances slowly so the need to regularly add to the pool. Deodorization tower on the side of the viewing port and the port is used to clean the inside of the filter device taken out for cleaning, because dust generated in the process will be puffed adsorbed on the surface of the filter, a long time will reduce the filtering effect.
Pneumatic conveying,crusher,bag-type dust remover and finished product warehouse.
First of pneumatic conveying equipment through the negative pressure ventilation fan at the top of the resulting extruded material through the pipe sucked into aggregate Shaq dragon, and then through the bottom of the airlock into the material is discharged into the shredder feed opening; pulverizer construction by crushing chamber, hammer, screen and fans, the material into a high speed rotary hammer to break the material, the side of the mill fan creates a negative pressure during operation, the diameter of the mesh material can be sucked out through a pipe blown into another aggregate Shaq Long, dust generated during transport will enter into the baghouse, the excess air is discharged through the bag, the dust is collected and then discharged through the bottom of the stripper into the final in the finished product warehouse ready packaging.
Complete line:
From raw feather to feather meal:
Product features and main purposes:
1.devices have the advantages of compact structure, smooth transmission, low noise, easy installation, easy maintenance, reliable operation and energy saving.
2.equipment seepage wall shell split bolt fastening structure for easy maintenance disassembly.
3.equipment used in transmission chain drive structure, with a smooth transmission, vibration, wear and so on.
4.equipment using continuous feed production mode, greatly improving the efficiency of dehydration.
5.equipment suitable for a variety of high-moisture materials before dehydration operation. The equipment has 6.high output, convenient operation, continuous production, wide range of feed, the different proportion of the 7.chemical industry, water content of large granular, fibrous, powdery loose material. equipment for feed, chemical industry, different proportion, water content of granular, fibrous, powdery loose material, such as feathers, starch, distiller's grains,Pulp, sugar and so on....
Gurantee:
1. Pre-shippment Inspection
a.) Supplier should trial run whole line at supplier's factory and Detailed operating and installation video before shipment;
b.) Supplier has to run the machine at least 1hour for each machine;
c.) All raw materials for that trial run to be arranged by supplier at their cost.
3.Service&Guarantee
a.) Free consultation service before, during, and after sales;
b.) Free project planning and design services;
c.) Free new production techniques and formulas;
d.) Provide 1 year complete warrantee and life-time maintenance service;The seller is responsible for the nature damage of the machinery in one year except for man-made damage.All spare parts and wearing parts are attached with the machinery for free; and these parts should be enough for one year use.
2.Payment Terms
30% of the whole amount pay as down payment by T/T ; The balance 70% paid before shipment after inspection by T/T.
3.Delivery Time
20-30 working days after confirmation of the initial payment. Holiday will be automatically postponed to meet after the holidays
4.Shipment
All the machines in the list should be packed in one 40ft containers. The transport freight should be confirmed by two parts before delivery.
5.Workers: 2-3 operators are needed to run the full line. In the noon should better make the machine running.
Free spare parts:
Operation:
One, Installation: For the smooth operation of the equipment, the equipment must be firmly fixed on the concrete foundation and connected to the drain pipe. The fuselage must be leveled during installation and the foundation must be padded between the bottom and the foundation to prepare for the test run.
Two, test before the test
Check the power supply voltage;
Check insurance
Check motor wiring
Check gearbox filling gear oil;
Check the motor steering; (check before removing the V-belt)
Attention: When starting to feed the equipment, be sure to turn on the power switch, make sure the rotation direction of the spindle is correct, and the material should be slowly added when the material is put on. When the material is discharged from the material outlet, the product requires the water pressure to adjust the pressure. Until the product reaches the standard water content can continue to feed.
Three, safety rules
1, staff must read carefully before using the instructions.
2, the device body may not enter the iron, stone and other hard debris.
Four, equipment maintenance and repair
1, regularly drain the drain.
2, regularly remove the power distribution box and equipment dust.
3, regular bearing lubricant replacement; gear reducer gear oil.
4, long-term disabled equipment, the body of the remains of materials clean up, water wall coating machine oil.
Transportation:
More questions pls contact anytime:
Ms Linda
Wechat:18979060966
Whatsapp:0086-18979060966