Roduct name | Pre-made Glitter Gold Wire Edge Satin Bow For Gift Packing Decoration Bow |
Item no. | YSP-0001 |
Material | 100% Polyester |
Application | For various gift box packing/flower packing\cake packing/DIY bow/party decorations/garment etc. |
OEM | Custom logo/pattern printing welcome. |
Size | 1/8"(3mm), 3/16"(5mm),1/4"(6mm), 3/8"(9mm), 1/2"(12mm), 5/8"(15mm), 3/4"(19mm), 7/8"(22mm), 1"(25mm),1-1/8"(28mm),1-1/4"(32mm),1-1/2"(38mm),2"(50mm), 2-1/4"(57mm),2-1/2"(63mm),3"(75mm),3-1/2"(89mm),4"(100mm) |
Printing craft | Ink/Puff/Heat Transfer/Gold & Silver Foil Printing, etc |
MOQ | 1000 pcs |
Delivery Time | Clear delivery time 7-15 days. |
Sample | Fast sample support.(Free sample ,if we have stock) |
AI confirm | We can give you AI picture within 24 hours. |
Shanghai Yinen Industry Co., Ltd was founded in 2009.We are based in Shanghai, China, with convenient access to public transportation. Our factory location is in JIANGSU province near Shanghai. We are a professional manufacturer. We mainly supply webbing, elastic strap, elastic tapes, jacquard tapes, cords, popular silicone dipping end cord, ribbon, grosgrain, belt, labels and so on. Products are exported to US,GERMANY,KOREA,JAPAN,FINLAND,ITALY,FRANCE,AUSTRALIA as well as China Mainland garment factories. Ten years of experience, continuous upgrading of manufacturing technology. Trust on us, we will not let you down! No matter price, quality or service! The customer always comes first !
Q :How about the payment?
A :Generally speaking, we have three payment methods, L/C, T/T and Western Union.
Q: What is MOQ and delivery time?
A: Delivery within three to five days after payment in stock, if it is customized, it will be delivered according to the situation.
Q:What's the order procedure?
A: First of all, confirm the required products, confirm the order, if there are products in stock, three to five days after the payment can be packaged and shipped.If the product needs to be customized, please confirm the customized pattern with the buyer, and the buyer will make samples and send samples. If the customer is satisfied, the product will be produced according to the order number, and it will be packaged and shipped in about 15 days.
Q: How does your factory control quality?
A:"Quality is priority!" Every worker keeps the QC from the beginning to the end.
Q: What is the quality of our product?
A :Polyester