BASIC SPECIFICATIONS | |||||
1 | Size | 500x500mm,1000x1000mm | 5 | Denseness | 950kg/m3 |
2 | Thickness | 15mm,20mm,25mm,30mm 40mm,50mm | 6 | Material | SBR+EPDM |
3 | Color | black with colorful EPDM on surface | 7 | Capacity | 420-1600SQM for one 20 feet container |
4 | Payment Terms | TT/Trade Assurance/LC/Western Union,etc | 8 | Delivery Time | About 7-10 days |
9 | Application | Home gym, fitness center, crossfit area, indoor place | |||
10 | OEM Service | Thickness, color can change according to your request |
FEATURES:
1. colorful.
2. Good elasticity, shockproof, it was called rubber carpet.
3. Easy drainage, no water leaves in surface, anti-slip.
4. Wearable, pressure resistance, abrasion resistance, anti-static, isolation.
5. Non-toxic, non-peculiar-smell, sound insulation, heat reservation, easy clean.
6. Aging resistance, oxidation resistance, and ultraviolet resistance, long time used in outdoor.
7. Health care, the elastic character can anti-fatigue, makes people ease.
8. Easy installation, colorful, various specification, all these characters can enlarge vision and creativity of designers.
CSP FLOOR PHOTO SHOW :
Q:What's your minimum order and delivery time?
500-1000 square meters: about 7 working days
1000-2000 square meters: about 10working days
Q:How to pay?
1.Tell us the exact dimension and quantity you order.We make quotation for you.
2.If everything is OK,we make a PI for you. Then please pay the 30% of the total amount to our account.
(we Accept T/T,Western Union,Credit Card,Visa Card,E-checking)
3.After we receive the 30% payment, we will produce the goods for you.
4.Once we finish the products ,we will send you the photos to check and confirm.
5.If everything is ok, we will send out cargo and give you a B/L copy.
6.After we receive the balance amount, we will send B/L to you, you can pick up your cargo.
Q: I pay money to you, is it safe?
WE ARE TRADE ASSURANCE MEMBER, YOUR PAYMENT IS GARRANTEE BY ALIBABA
Q:How to install it ?
There are two ways as below:
1. Put this product on floor directly.
2. Only put glue on floor first,then put it togerther is Ok .