Plastic costruction formwork is a kind of energy-saving and green environmental protection product, pp plastic combined with macromolecule nano-technology. Plastic formwork is a new product after wood formwork, composite steel formwork, bamboo-wood bonding formwork and all-steel large formwork. Hollow plastic formwork is energy saving and environmental protection,and can completely replace the traditional steel formwork, wood formwork, square wood, What's more, its amortization cost is very low.
Technical Specifications |
||
Serial Number |
Inspection Item |
Inspection Result |
1 |
Maximum Damage loading |
Vertical pressure 1024N |
2 |
Water absorption |
0.0037 |
3 |
Grip screw force(board) |
1280N |
4 |
Charpy unnotched impact strength |
Lateral pressure 120kj/m2 |
5 |
Shore hardness |
75 |
6 |
Falling ball impact test |
13.3mm |
7 |
Vicat softening point |
76.6 |
8 |
Resistance to acid and base saturated Ca(OH)2, soak for 48h |
No surface crack bubble |
Henan Yaohang PP Hollow Plastic Formwork For Concrete |
|||||
Size |
Thickness |
Weight |
Density |
Container Loading(pcs) |
|
20HQ |
40HQ |
||||
1220*2440MM |
12MM |
21±1KG |
587.8kg/m3 |
590 |
1200 |
1220*2440MM |
14MM |
24±1KG |
575.8kg/m3 |
510 |
1080 |
1220*2440MM |
15MM |
25±1KG |
559.8kg/m3 |
470 |
1026 |
1220*2440MM |
16MM |
27±1KG |
566.8kg/m3 |
440 |
936 |
1220*2440MM |
18MM |
29±1KG |
541.2kg/m3 |
390 |
900 |
The key process in producing plastic concrete wall formwork is to make sure the formwork flat and tidy, easy stripping, can keep stable weatherability,and not easy to change shape.
Raw Materials Preparation --Extrusion--Moulding--First Cut--Pulling--Second Cut--Fine Pruning--Sealing the edge--Product Packaging
Plastic Construction Formwork can be used in Construction Engineering, Bridge Tunnel Engineering, Water Conservancy and Hydropower Engineering, Mine Dykes and Underground Engineering, Pipeline Turnover, etc.
High-rise Building and Construction Engineering
The building formwork is a kind of temporary structure, which is made according to the design requirements, so that the concrete structure and components are shaped according to the prescribed position and geometrical dimensions, maintain their correct positions, and bear the weight of the
building formwork and the loads acting on it. The purpose of carrying out the formwork project
is to ensure the quality of concrete works and construction safety, speed up construction progress and reduce project costs.
Bridge Tunnel Engineering &Water Conservancy and Hydropower Engineering
Plastic Construction Formwork has light weight, high strength, good hardness, impact resistance, and wear resistance properties, the surface is flat and smooth; the pouring molding effect is good. As it is no water absorption, no deformation, and no mildew, after long-term soaking in water, it is not layered, no foaming, and the sheet size is stable. It is especially suitable for water conservancy projects.
Mine Dykes and Underground Engineering, Pipeline Turnover
The toughness of a plastic building template is very good and it can be made into a variety of special templates for curved surfaces. The plastic construction template is resistant to acid, alkali and corrosion; it is very suitable for applications in coastal areas, underground engineering, mines, and seawall dams. No need to do any antiseptic treatment for use and storage, do not pollute the concrete surface.
Henan Yaohang Alloy Formwork Co., Ltd., is a set of plastic concrete wall formwork research and development, production, sales, service in one of the high-tech enterprises, is committed to creating environmental protection, conservation, efficient construction environment, to create a new era of low-carbon green construction, to promote circular economic development.
Combined with the current situation of construction at home and abroad, the company by virtue of strong enterprise strength, strong scientific research force, special domestic experts, to import propylene resin as the base material, the development of a new hollow plastic building template, not only improve the quality of construction and construction efficiency, but also reduce the construction costs of enterprises, bringing great economic and social benefits.
Since its inception, has always adhered to the "quality first, integrity first, win-win cooperation" as the business philosophy, and actively introduce ISO9001 quality system certification, so that the company's management standardization, institutionalization, improve industry competitiveness, improve social influence, promote innovation and upgrading of building technology.
Yaohang's plastic concrete shuttering plates are well known by many domestic and overseas customers.
Yaohang has independent research lab and testing equipments. It can test all the items in the COA to make sure the quality are passed and approved. We can also produce special goods acording to customers' special requirements.
1.Q: Are you a factory or trading company?
A: We are a factory of plastic concrete shuttering plates.
2.Q: How can I get some samples?
A: We are honored to offer you free samples.
3.Q: How does your factory control quality?
A: Quality is priority. We always control from the very beginning to the end , from the raw materials to the production. Every batch of materials, we must test the quality about the impact stength , Vicart , bending strength. Our factory has gained ISO9001:2008.
4.Q: How many times does your formwork reused?
A:It can be reused over 60 times.
5.Q: Does this formwork stick concrete? and easily remove or not?
A:It doesn't stick concrete and easily remove, even no need any release agent, only tapping can fallen off.
6.Q: How to clean the used formwork?
A: Only using the high-pressure water gun can make it clean.
7. Q: what are your foreigh markets?
A: Middle East countries, Africa countries, the eastern European countries,Oceania countries