Parking Product Description | |
Column | H section stee, painted |
Beam | H section steel, painted |
Flooring | 2.0mm galvanzied steel deck |
Connection | Bolted |
Floors Number | 2-5 floors for most |
Installation | |
Engineer | 1 or 2 engineer |
Worker | 15-25 workers for most of the projects |
Main machinery | 1-2 sets truck crane |
Time | 20-50 days after correct foundation finished |