Plastic cup covers,lids thermoforming machine
Features
1) Sensor controls are adopted by pneumatic system.
2) Automatic, equipped with PLC touch screen.
3) AVF-L series support frequency conversion, and can adjust the length of stroke easily. It is simple and convenient to change the mold.
Product Introduction
AVF-L series automatic blow molding and plastic sucking lids forming machine are developed by our research and development personnel according to the demand of packing market. In combination with the advantages of aluminum-plastic blister packing machine and plastic sucking forming machine, AVF-L series is a new type production developed in light of pharmaceutical standard GMP and food standard QS. This machine adopts a fully automatic flow covering blow molding or plastic suction molding, punching and diet cutting as the special properties of products required by the users. It is applicable to the plastic ware such as PVC, PET, PS medicine trays, and cup lids thermoforming boxes. And have a good selling in this market.
Technical Data AVF-L series
Model | AVF-350L | AVF-450L |
Max. forming size | 330×160mm | 430×210mm |
Max. forming height | 47mm | 47mm |
Stroke | 65-165mm | 60-240mm |
Power supply | 380V/50Hz/3phase | 380V/50Hz/3phase |
Air supply | 0.5-0.8Mpa | 0.5-0.8Mpa |
Power Consumption | 4.5KW | 8.5KW |
Tool cooling | Tap water recycle water 60L/H | Tap water recycle water 60L/H |
Punch recycle time | 15-40(Times/Min) | 15-40(Times/Min) |
Machine size(L×W×H) | 1900×790×1700mm | 3500×1000×1800mm |
Net weight | 950Kg | 1700Kg |
Samples
Remarks: The price is non-including the mold cost.
Payment Terms: T/T 40% deposit before production, 60% balance before delivery date;
Delivery time: 35-40 business days after deposit;
Validity: 30 days after quote.
Departure Port: Guangzhou Huangpu or Shenzhen port;
Warranty: We guarantee these machines for one year. And we supply some spare parts with the machine,operation manual and operation CD, etc.
Service: We will send engineer who install and train in your company for approximately 7 to 10 days, after machine is arrived your place. And the flight tickets, visa and accommodation of engineer will be arranged by buyer, also the buyer need pay 100USD/day for training cost.