Painted pipe scaffolding steel pipe 60mm | galvanized iron ERW pipe price
Specification
1.Product name: galvanized ERW pipe
2.Outer diameter: 21.3mm-406.4mm
3.Wall thickness:0.6mm-20.0mm
4.Length:0.3-12m
5.Zn coating mass:275-600g/m2
6.Material:Q235B,Q355,S235JR,S355JR,STK400,STK500
7.Tolerence: 8%
8.Surface finish: hot dipped galvanized, electro galvanized, black, painted, engraved
9.Standard:BS1139-1990,EN39-2001,JIS G3444:2004
10.Port of loading: Tianjin
11.Samples are available
12.ISO 9001-2000 approved.
13.Performance:good bearing capacity,durable & stable
14.Test: SGS, BV or as per your request
15.Produced in our own factory,can control the zinc thickness much better
16.OEM service is available.
High tensile galvanized ERW pips are designed for tubes&coupler scaffolding.The tubes have hot-dipped
galvanized surfaces finish so as to provide excellent appearance with sufficient durability in such
applications where salty air or long-term weather exposures are inevitable.
Standard Size
Outer Diameter | Wall Thickness | Length | |
Inch | mm | mm | 0.3-12 |
1/2'' | 21.3 | 0.6-3.0 | 0.3-12 |
3/4'' | 26.9 | 0.6-3.0 | 0.3-12 |
1'' | 33.4 | 1.0-3.0 | 0.3-12 |
1-1/4'' | 42.3 | 1.0-4.0 | 0.3-12 |
1-1/2'' | 48.3 | 1.0-4.0 | 0.3-12 |
2'' | 60.3 | 1.5-4.0 | 0.3-12 |
2-1/2'' | 76.1 | 1.5-4.0 | 0.3-12 |
3'' | 88.9 | 1.5-9.5 | 0.3-12 |
4'' | 114.3 | 2.0-9.5 | 0.3-12 |
5'' | 141.3 | 3.0-9.5 | 0.3-12 |
6'' | 168.3 | 3.0-12.0 | 1.0-12 |
8'' | 219.1 | 3.2-12.0 | 1.0-12 |
10'' | 273 | 3.2-12.0 | 1.0-12 |
12'' | 323.8 | 6.0-15.0 | 1.0-12 |
14'' | 355.6 | 8.0-15.0 | 1.0-12 |
16'' | 406.4 | 8.0-20.0 | 1.0-12 |
Why Us:
Xiangjia Steel is a leading manufacturer of galvanized ERW pipe, system scaffoldings and accessories,
galvanized steel tube,Frames,steel props, metal planks and other related products.
• More than 20 years experience, sales volume reaches 1.5 billion US dollars.
• Good quality control in production process, ISO9001:2008,SGS,BV approved.
• Excellent quality and Competitive price, OEM is available.
• Available in an extensive range of stock or custom size.
• The whole process from material to finished products can be traced.
• Our factory is close to the port-Xingang,Tianjin.
Trade Terms:
• Payment: T/T 30% in advance, balance against copy of B/L,Western Union, L/C etc.
• Production Lead Time: 15- 40days after deposit paid.
• Shipping Methods: Oean carriage.
• FOB Shipping Port: Tianjin, Shanghai, China.
• FOB/CIF/CNF term available
For more details please contact us freely ^_^