GOLIN TOOLS
(1) Every single tool is traceable, thanks to a unique serial number marked after the first quality control.
(2) Golin raw material is provided by qualifiled suppliers and chemical composition corresponds to
Chinese standards. Therefore, raw material yield and tensilev strength are guaranteed.
(3) ISO 9001-2008
(4) Golin tools induction hardened to 55+/-3HRC
Material | Mechanical resistance of the material and the tools body |
Hardness of the material and the tool body |
Hardness of the operating surfaces after induction hardening |
42CrMo | 900~1150 N/mm² | 40~47 HRC | 47+/-3 HRC |
C45 | 560~710 N/mm² | 20~28 HRC | 52~58 HRC |
Two Methods of Hardening
(1) Full hardening is the traditional Method for tools in China, suit for all kinds of tools.
Golin new induction hardening method for meet more high hardness requirements from different customers,
we have already tested induction hardening for more than 4 years. Therefore, all induction hardened tools are very stable now.
Two methods of hardening , suit for different tools , aim at longer usage life.There is no best tools ,
only more suitable tools for customer.
(2) Much full experience of design and produce special tools for more than 15 years.
(3) All inquiries will be replied in 8 hours during working time. Special tools designing in 24 huors.
Quickly after-sales services.
1. Q: Are you a factory or trading company? How is you factory extrusion experience?
A: We are a factory. 15 years Manufacturing experience.Leading supplier in Maanshan city.
2. Q:Can you put my brand logo on these products?
A:Yes we can.
3. Q:What is the Minimum Order Quantity (MOQ) for your OEM service?
A:MOQ is 1pcs.
4. Q:When can you ship the products after we make payment?
A:Production time is normally 15-25 days.
Transportation
|
Quantity
|
Means
Of TransportOf Transport
|
Shipping Time
|
Origin And
Destination
|
Express
|
Suit for
small order and sample order
Weight<50kg
|
DHL
Fedex
EMS
UPS
|
3-10 days
|
Door to door
|
Air Transportation
|
Suit for middle order
150kg>Weight>50kg
|
By Plane
|
5-15 days
|
Airport to airport
|
Sea Trasnsprtation
|
Suit for big order
Weight>100kg
|
By Ship
|
15-35 days
|
Sea port to sea port
|