Filling is the first step in the entire injection molding cycle. Due to the flow of the fountain, the plastic polymer chains in front of the flowing waves are directed to the almost parallel flow wavefront. Therefore, when the two plastic melts meet, the polymer chains of the contact faces are parallel to each other; plus the two melts have different properties (different residence time in the cavity, temperature and pressure are different), resulting in the fusion zone of the melt. Microscopically, the structural strength is poor. When the parts are placed at an appropriate angle under light, they are visually observed, and it is found that a significant bonding line is produced, which is the formation mechanism of the weld lines. The weld line not only affects the appearance of the plastic part, but also has a loose microstructure, which tends to cause stress concentration, so that the strength of the part is lowered and fracture occurs.
In general, the strength of the weld line which is welded in the high temperature region is preferred. Because of the high temperature, the polymer chain activity is relatively good, and it can penetrate and entangle each other. In addition, the temperature of the two melts in the high temperature region is relatively close, and the thermal properties of the melt are almost the same, which increases the strength of the welded region; In the low temperature region, the welding strength is poor.
Our UAE Customer come to visit our factory and check our production line. After they returned to uae, we received the order of PA66 gf30.
Our Indian Customer, they need to develop a new PA66 GF30 molding part, they come to visit us and take the drawing, hope we can design and make their product come true.
This is one of Our Swedish customer. They come to visit us and deliver their two molds to us to make mass production.
A: It will take 25-30 days to make the mold, according to the size and complexity of the product.
A: Yes, after mold finished, we will send our customer some free samples.
A: Payment: 50% Mold cost deposit, balance mold cost +50% production cost paid when the samples been approved by buyer, balance production cost paid against copy of B/L. We accept T/T, Paypal.