Name | Specification | KNNP-58-1.8-10 | KNNP-58-1.8-20 | KNNP-58-1.8-30 | |||
Water tank | Tank capacity | 100L | 200L | 300L | |||
Inner tank | Stainless steel SUS304 | ||||||
Outer tank | Galvanized steel/Stainless steel | ||||||
Insulation | Polyurethane/Thickness50mm | ||||||
Tank diameter | Outer tank: Φ460mm; Inner tank: Φ360mm | ||||||
Support | Material | Galvanized steel/Stainless steel/Aluminum | |||||
Tilt angle | 21°/27°/33°/45°/50° | ||||||
Vacuum tube | Material | High borosilicate glass, three layers coating vacuum tube(ALN-CU-SS) | |||||
Tube quantity pcs | 10 | 20 | 30 | ||||
Assistant water tank | Capacity: 5 liters, Material: Same as main water tank | ||||||
Solar Controller | Tk-7 | ||||||
Electric Heater | 220V,1500W | ||||||
Qty.20"GP/40"HQ | 80/195 | 40/97 | 26/65 |
By sea | Delivery from Shanghai or Qingdao seaport | ||||||
By air | Departure from Shanghai Pudong Airport | ||||||
By express | TNT / DHL |
Payment Term | T/T | EXW | 30% T/T in advance, paid the balance before shipment | ||||
FOB | |||||||
CFR(C&F) | 30% T/T in advance, paid the balance against copy of B/L | ||||||
CIF | |||||||
L/C | L/C amount above 50,000 usd, we can accept L/C at sight | ||||||
West Union | Amount lower than 1000usd | ||||||
West Union | |||||||
Delivery Time | 7~10days after receiving payment for one container |