New design bucket elevator calculations /bucket elevator/elevator bucket
The hoist is a chain hoist: the lifting height is from 1.6 meters to 3 meters. It is suitable for plastic trash cans such as national standard 120L, 240L, 360L, 660L, 1000L,etc. The lifting weight can be customized to increase the range from 50KG to 1000kg. The angle is 135 degrees -145 degrees, and the lifting speed is 1-2 times per minute. The hanging bucket type trash can hoist adopts chain and motor linkage device, and some equipment adopts hydraulic lifting to realize lifting and turning of the garbage bin, and automatically collect garbage in multiple garbage bins into the garbage bin.
Equipment introduction:
This hoist is a chain hydraulic hoist: lifting height from 1.6 meters to 3 meters, suitable for barrels of national standard 120L, 240L, 360L plastic trash can, lifting weight 250KG.turning barrel angle 135 degrees, lifting speed per minute 1-2 times. The hanging bucket type garbage bin hoist adopts chain and motor, hydraulic oil cylinder and hydraulic oil tank linkage device to realize lifting and turning of the garbage bin, and automatically collect garbage in multiple garbage bins into the garbage bin.
Instructions for use:
The trash can is placed on the elevator, so that the trash can lifting mechanism is embedded in the front edge of the trash can, and the ascending button is activated, and the trash can is automatically raised to the upper garbage entrance. The machine automatically flips the garbage in the trash can into the entrance. After the garbage is dumped in the trash can, the descent button will be clicked, and the trash can will automatically drop to the ground and the trash can can be removed after the floor is stable.
Hoist safety operation procedures:
1. The hoist instructor performs maintenance and management, and the key of the power switch box is managed by the designated personnel.
2. Observe how the hoist material is filled in the drum, whether there is single-sided loading, overload or material protruding from the barrel.
3. Check if the position of the bucket is in compliance with the hoist standard and change the placement position in time.
4. During normal operation, observe whether the running speeds on both sides of the movable frame are synchronized and parallel to the same plane.
5. Lifting, before landing, should check whether the surrounding working environment is safe.
6. The hoist is never allowed to carry people up and down.
7. It is strictly forbidden to stand under the hoist.
8. Always keep the environment around the hoist.
9. Regularly apply grease to the hoist chain sprocket for maintenance.
10. Before using the hydraulic pump station, check if the fuel tank is full. If it is lifted, it can be tested first. The equipment is equipped with handle operation.