The second generation vacuum smelting furnace of our company adopts the structure of pit receiving tank, The scales thrown out by the water cooling roller are crushed once and directly fall into the pit receiving tank. After the upper cover of the receiving tank is automatically closed, the receiving tank is automatically pulled down and manually hoisted to other places for secondary cooling, and quickly replaced with another receiving tank for the next furnace. Such a working mode greatly improves the working efficiency and can produce 8-10 furnaces a day.
1.2 This "Technical Specification" puts forward the technical requirements for the supply, installation guidance and commissioning of the "Vacuum Melting Rapid Solidifying Furnace-600" (hereinafter referred to as "Vacuum Rapid Solidifying Furnace"). The scope of the Seller's responsibility includes the supply, installation guidance and commissioning of the vacuum rapid solidifying furnace.
1.3 The Seller shall guarantee to provide high-quality products conforming to this Technical Specification and relevant international and domestic industrial standards.
1.4 In case of any contradiction between the standard required in this Technical Specification and the standard implemented by the Seller, the higher standard shall prevail.
1.5 In the process of equipment installation and during the operation quality guarantee period, in case of manufacturing quality problems, the Seller shall repair or replace them free of charge. If the equipment is damaged due to improper storage, the Seller shall negotiate to solve the relevant problems and do a good job in technical services.
1.6 The Seller shall be fully responsible for the overall performance of the "Vacuum Smelting Rapid Solidifying Furnace" in the supply, which shall meet the design requirements and meet the operation requirements.
1.7 This Technical Specification shall be regarded as an annex to the Supply Contract after confirmation by the Buyer and the Seller, and shall have the same legal effect as the text of the Contract.
1.8 The documents provided by the Seller, including drawings, calculations, instructions, operating instructions and all phase data, shall use the International Equivalence System (SI). All documents, engineering drawings, relevant information and mutual communication shall be provided in Chinese.
1.9 The text interface of the equipment, all accessories, control systems, instruments, etc. matched by the Seller shall be in Chinese, and the unit shall be the national standard unit.
1.10 All supplied equipment is only allowed to be assembled before arriving at the site, and disassembly and assembly are not allowed.