Enquiries
Message
Home > Products > Other
N2 Cylinder hydraulic pressure testing equipment/ hydrostatic testing machine
  • N2 Cylinder hydraulic pressure testing equipment/ hydrostatic testing machine

N2 Cylinder hydraulic pressure testing equipment/ hydrostatic testing machine

FOB Reference Price
Purchase quantity ()
Minimum order quantity
Payment
Meorient Import & Export  Co.LTD
Meorient Import & Export Co.LTD
China - Hangzhou
Trading Company
Trade Capacity
Export Percentage
Nearest Port
Hangzhou,Shanghai
Accepted Delivery Terms
Employees
5-10人
Accepted Payment Currency
USD,CNY
Average Lead Time
45 Day(s)
Certifications
Product Specifications
--
Product Description
Overview
Quick Details
Place of Origin:
Hebei, China
Brand Name:
Haori
Model Number:
ZL-1/22.5-II
Power:
Hydraulic
Usage:
Deformation Testing Machine
test pressure:
40 mpa
clamping method:
peumatic
weight:
750Kg
automatic stutus:
automatic fill in watter and overturn
diameter:
210-220mm
The heigh::
1200-1600mm
fit for 1:
N2 cylinder
fit for 2:
CNG cylinder
fit for 3:
co2 cylinder
fit for 4:
O2 cylinder
Supply Ability
Supply Ability:
500 Set/Sets per Week
Packaging & Delivery

N2 Cylinder  hydraulic pressure testing equipment/ hydrostatic testing machine 

pressure:40 MPa
diameter  210-220mm
The heigh:1200-1600mm

Cyinder hydraulic test device/ Cyinder hydrostatic test device

Extinguisher Cyinder hydraulic test device/Cyinder hydrostatic test device

 

A steel bottle type of test pressure loading machine in model of ZL-1/22.5-III is a third decade of improved test pressure device. Compared with early products, its main character is taking a pneumatic clamping device and a pneumatic facility for returning water to restored position (if the user want to use a manual way for claming, it can be order to make).

 

The steel bottle test pressure loading machine is composed of two parts: 1. a loading bottle valve device and a returning water device; 2. an electric test pressure pump and a measuring cylinder. If the user does not need the test pressure pump part, this equipment will be changed into a bottle loading and returning water machine. The user can only use the function in the bottle loading and the returning water.

The machine gathers machinery, electricity and pneumatics and can realize the following three functions

a. The loading & unloading the bottle valve

b. The water pressure intensity test, the volume distortion measure & test

c. The turning over for water fall.

 

2 The performance parameters

1.  The rational water test pressure              P1=22.5MPa

2. The valve automatic control wrest moment on the spindle       M1=300N•m

3. The maximal wrest moment on the spindle gas valve            M2=450N•m

4. The returning water angle                     R=145O

5. The drive motor

      The model           Y90S-4

      The power           1.1KW

      The rotation speed           1390r/min

6. The power source     380V/50HZ

7. The gas source     P=0.7-0.8Mpa(a safety gas)

8. The top & bottom stroke of the spindle          S1=530mm

9. The stroke of the steel bottle clamping machine      S2=100mm

10. The outer size (length×width×height)

            a. The main body size 1000×600×3000

b. The electric operation station 600×450×1150

(The electric box without the test pressure pump is installed on the main body of the equipment)

c. The electric test pressure pump  655×480×1055

11. The weight(the main body) 750Kg

3, The introduction for the structure principle

The steel bottle test pressure loading machine is composed of the bottle valve loading & unloading device, the returning water device, the electric operation station and the electric test pressure pump (if there is no a test pressure pump, it can only be used as a bottle valve loading & unloading machine and a returning water machine, so this manual is used as a use instruction manual for the bottle valve loading & unloading machine).

 

4,The installation

1. The equipment body and the foundation are connected with the foot bolts and the pressing plates, which level <1/m.

2. Connect the compressed air pipeline and ask the pipe arrangement to be in order and no leakage.

5,The usage instruction

1. The preparation work

a. The gas source

To assure the gas pressure in 0.7-0.8Mpa, except the air compressing pump, you can get the compressed gas (nitrogen is the best) by a decompression valve.  Adjust  the pressure in0.7-0.8Mpa(one bottle of oxygen in 12Mpa can supply the cylinder in the equipment to work about 300 times).

6, The maintenance 

1. The gear, the tooth bar, the spindle and the bears need to put the lubricating grease in a fixed term.

2. If the belt is loosed or sliding, it should be adjusted the distance or replaced a new one.

are appling CE foundin in 1978, with more than 30 years experience.

5,all life technical support and after-sale service.

 

No desirable products?
Sourcing assistant>
How to start your business
  • Step 1
    Find your interested products by search keywords
  • Step 2
    Contact the supplier by clicking ”Enquire” or “request meeting” button, otherwise, you also could consult our import consultant.
  • Step 3
    After verifying your email, get response from suppliers or our trade manager will contact you as soon as possible
  • Step 4
    Set up meeting with the Chinese supplier without language barrier
Send Enquiry
ToLily Liu
Meorient Import & Export Co.LTD
Enquire
Popular Searches
lathersbuchertether.thermosatherosfortherusherfinetherhb thermfortherthoraether.thermoslocherfletcher