Exclusive service |
Welcome to be the our franchisee and agent, we will provide : |
·Standard retail price |
|
·Free consultation |
|
·Free 2D + 3D Precision design |
|
·Nanhai Lingtong, the best aluminum in Guangdong,China is used |
|
·Online installation assistance and on-site installation guidance |
|
Design |
customized,fashion and technology |
stackable/Top load |
Not approve (Except for second opening area) / 400-450KG/m² |
Power supply |
250V 2500W (base on your place) / One plug to operate whole room |
Waterproof |
Grade 8 |
Sound insulation |
Grade 10 <=45dB |
Wind resistance |
Grade 11 |
The module house support whole house delivery, as well as bulk module packaging delivery, which greatly reduces the burden of transportation and installation. |
||
Accommodation scenarios: |
Business scenarios: |
Work scenarios: |
1. Airport,Train station rest room |
1. Share breakout room |
1. Sound Insulation meeting room |
2. Sky garden hotel, |
2.Characteristic restaurant,coffee, |
2. Independent office,garden office |
pub,barber shop |
||
3. Road trip rest area |
3. Shower room,movable toilet |
3. Prayer room |
4. Seaside resort |
4. Mother-and-baby room |
4. Co-working office |
5. Characteristic hotel suite |
5. GYM |
Etc... |
6. Characteristic B&B |
6. Smoking room |
Why Compare?
ADVANTAGES |
Simply maintenance |
The innovative steel construction system guarantees time and cost savings in case of possible maintenance work. |
Space gain |
The plasterboard panels can be applied direct ly to the external wall of the prefabricated bathroom in order to obtain a more spacious room. |
High performance |
The high quality sandwich panels guarantee high sound insulation performance and fire resistance. |
Time saving |
No additional work on-site. Save time and money. More than 10 work steps saved. |
Respect for the environment |
Our prefabricated bathrooms do not produce any waste on site. We prefer the use ecological and high quality materials, paying attention to low VOC values. |
1.Q: Is a licensed builder required for the house installation?
A: No, any handyman can do it. We provide a 50 minutes instructional video with every purchase.
2.Q: What site preparations needed to put one of your houses on?
A: We recommend putting them on besser blocks if the ground is levelled and not highly reactive. Otherwise you might consider putting them on stumps or slabs.
3.Q: Do you arrange electrical and plumbing connection to the home?
A: No we don’t, the electricity connects via a caravan plug or you can hardwire it. The plumbing needs a plumber to hook it up the sewerage and the water supply.
4.Q: Can you supply composting toilet, solar panels, hot water system or a split system aircon?
A: Not at this stage. Even if we did, you are better off doing it your self. Because if we were to do it, we contract a third party and then put our margin on top.
5.Q: What is your shipment way?
A: You can choose EXW,CIF or Door to Door(ship to your house) as you need.
6.Q: How long is the production time?
A: 25~30 working days after receiving 50% deposit.
7.Q: How can I place an order and pay?
A: Click below and send us inquiry,professionals will contact you within 24 hours.
phone booth,phone pod,acoustic hood,Acoustic pod,soundproof booth,soundproof pod,silence booth,silence booth,meeting pod,office pod,studio booth,studio pod,music booth,music pod,recording booth,isolation booth,solo office,saxophone,chatting room,office,record studio,piano training,live,music instruments,education training,phone booth,meeting,work,study room,studio booth,studio pod,music booth,music pod,recording booth,isolation booth,medical booth,medical pod,mobile medical booth,air pod medical,pod house,pod home,pod room,pod booth,container house,prefab house,tiny house,glass house,modular house.