The Main Technical Parameters | ||
Model | LD-8200/LD-8250 | |
Packing material | 3-side, four edge-sealing bag, self-reliance bag, handbag, spout bags, zipper bag, compound bag, etc | |
size | W:70-200/100-250 | |
Filling range | 10-1000g/20-2500g | |
Packing speed | 40-60bag/min(speed is determined by the product filling quantity) | |
Average precision | ≤ ±1% | |
Total power | 2.5KW | |
Dimensions | 1900mm X 1570mm X 1700mm(L*W*H) | |
Main standard parts | 1. Code printer 2. PLC control system 3.Bag opening device 4. Vibration device 5.Cylinder 6. Electromagnetic valve 7. Temperature controller 8.Vacuum pump 9. Inverter 10. Output system | |
We can customize the suitable one for you according to your requiredment. Just Tell us : Weight or Bag Size required. |
Parts of Machine | ||||||||||||||||
Parts | PLC | Touch Screen | Frequency Conveter | Vacuum Pump | Printer | Main Motor | Temperature Controllor | Proximoty Swith | ||||||||
Brand | SIEMENS | SIEMENS | TOSHIBA | ORION | SHENG LONG | EVERGEAR | AISET | OMRON | ||||||||
Oringin | Germany | Germany | Japan | Japan | China | China | China | Japan | ||||||||
Can replace parts as needed. |
Work Process | ||
Safety Measures | 1.no bag feeding, no filling and no sealing. 2.no bag opening/open error, no filling and no sealing 3.no filling, no sealing | |
Product Process | Station 1 Bag Feeding Station 2 Date Printing (option)and Open zipper bag Station 3 Open bag Station 4 Filling Materials Station 5,6,7 :Vibration,Air Removal,Nitrogen Filling,Close Zipper,Hole Punching,Heat Sealing Remark:No.5.6.7.Stations are based on customer requirements for adjusting. Station 8 Heat Sealing and Product Output | |
Stations are based on customer requirements for adjusting. |
Q1: Are you factory or trading company? |
A: We are factory or manufacturer. |
Q2: Can you guarantee your quality? |
A: Of course. We are the manufacture factory. More importantly, we put a high value on our reputation. Best quality is our principle all the time. You can be assured on our production completely. |
Q3: What should I do if we are not able to operate the machine when we receive it? |
A: Operation manual and video demonstration sent along with the machine to give instructions. Besides, we have professional after-sale group to customer 's site to solve any problems. |
Q4.What's the payment terms and trade terms for new customers? |
A: Payment terms:T/T,L/C,D/P,O/A, Western Union etc. |