Enquiries
Message
Home > Products > Other
Motorcycle spare parts systems 8 pin BAJAJ DISCOVER DISCOVER100 pulsar150 100cc 150cc motorcycle ignition cdi unit
  • Motorcycle spare parts systems 8 pin BAJAJ DISCOVER DISCOVER100 pulsar150 100cc 150cc motorcycle ignition cdi unit

Motorcycle spare parts systems 8 pin BAJAJ DISCOVER DISCOVER100 pulsar150 100cc 150cc motorcycle ignition cdi unit

FOB Reference Price
Purchase quantity ()
Minimum order quantity
Payment
Meorient Import & Export  Co.LTD
Meorient Import & Export Co.LTD
China - Hangzhou
Trading Company
Trade Capacity
Export Percentage
Nearest Port
Hangzhou,Shanghai
Accepted Delivery Terms
Employees
5-10人
Accepted Payment Currency
USD,CNY
Average Lead Time
45 Day(s)
Certifications
Product Specifications
--
Product Description
Overview
Quick Details
Type:
CDI UNIT
Place of Origin:
Chongqing, China (Mainland)
Brand Name:
SH SM
Warranty:
1year
Product Name:
Cdi Unit
Model:
DISCOVER100 DISCOVER DTSI PULSER150 DTSI DS111003 PLSR150 DSVR100
Material:
Plastic+electronic components
parts code::
DS111003
Color:
Black
Quality:
OEM and good quality 100%
type::
Capacitor discharge type (CDI)
Size:
75*60*25mm
Packing:
Neutral
MOQ:
50PCS
Certification:
CQC ISO9001
Packaging & Delivery
CDI-3

Motorcycle spare parts systems 8 pin BAJAJ DISCOVER DISCOVER100 pulsar150 100cc 150cc motorcycle ignition cdi unit

 

Technical requirements
1,The ignition characteristics:
--- AC power supply, capacitor discharge ignition;CDI UNIT;
---Ignition energy into the corner, low-speed, high-speed ignition performance;
---Operating temperature range: -30°C to+65°C;
--- Using SMT Surface Mount Technology, anti-jamming capability, environmental adaptability, high reliability;
2,Product performance:
--- Minimum continuous ignition speed: ≤350r/min (three-pin 6mm intermittent trigger gap was 0.7mm);
---Continuous ignition speed range: ≤350r/min ~ 11000r/min (three-pin intermittent 6mm, trigger gap was 0.7mm);
---Into the corner speed: 2000±200r/min (15±1.5°);
---End angle, speed: 3800±200r/min (36±1.5°);
--- Ignition advance angle: 21°±1.5°;
---Turn off the SW end of the ground, ignition should turn off.
3,Appearance requirements:
---Patch device and igniter shell at the bottom of the vertical tilt;
--- Package surface should be smooth, free of cracks and other foreign matter;
--- Encapsulation material and the shell is bonding well, without gaps, and should fully cover the components;
---Package surface height should not exceed the shell height, and the surface is smooth and no bubbles;
--- Shell, patch the surface should be encapsulated material, and other attachments;
4, Igniter insulation resistance shall be not less than 1MΩ (measured with 500V megger);
5, In line with the motorcycle JB/T8123.1 ~ 8123.2-1999 standards;

Argentina Market:
GXT200/C70/DAX70/C90/C100/C110/CD110/MAX110/CG200/HJ200/CG150/HJ150/CG125/HJ125/GY6-50/GY6-60/GY6-80/GY6-100/SCOOTER125/GY6-125/SCOOTER150/GY6-150/WAVE110/NX200/CBX200/TITAN150/TITAN99/TITAN2000/RX100/YBR125/ NXR125 BRPSS/STROM125/WAVE110/SMASH
Columiba Market:
LIBERO/LB50/MT90/V50/PULSAR/FC80/RJ/STORM/RG110/RX100/RX125/RX115/RX135/RXK/SMASH110/STROM/SUPRA/T50/TITAN99/TITAN150/TR125/TS100/TS125E/WAVE/V50/V80/V80 NEW MODEL/WY147/XF90/XF125/XL125/XL185/XR200/XRM/BWS125/YBR125/AKT110/AK125/AKT125/AKT125 MKD/AKT125 TT/AKT EVO/AX100/JOG90/APACHE160 RTR160/BEST125/BOXER /GIXXER150/CT100/C50/C70/C90/C100/C110/CARGO125/CARGO150/CBF150/PULSAR135/150/180/200/220/200NS/CD100/BIZ/CD100/CG125/CG150/EN125/AX115/CM125/CRYPTON/CUB/DISCOVER/DT125/DT125K/DT175K/DY90/DY100/ECO/EM125/EN125/FD115/FD115/FR50/FR80/CAS/GD116'GD125/GL125/GLX50/GLX90/GN125/GN125H/GS125/GSX/GY6-150/GY6-200/CB150/JD100/JH70/JH150/K90/LEAD90/GSD-16/BWS125

 

No desirable products?
Sourcing assistant>
How to start your business
  • Step 1
    Find your interested products by search keywords
  • Step 2
    Contact the supplier by clicking ”Enquire” or “request meeting” button, otherwise, you also could consult our import consultant.
  • Step 3
    After verifying your email, get response from suppliers or our trade manager will contact you as soon as possible
  • Step 4
    Set up meeting with the Chinese supplier without language barrier
Send Enquiry
ToLily Liu
Meorient Import & Export Co.LTD
Enquire
Popular Searches
lathersbuchertether.thermosatherosfortherusherfinetherhb thermfortherthoraether.thermoslocherfletcher