3-Vessel Brewhouse Complete List | ||
Main System | Item | |
1.Milling System | Malt Grinder | |
2.Heating System | 01.Boiler (Steam/ Electric/Oil-fired) | |
Heating Way | Steam Heating/Electric Heating pipe heating | |
Direct fire heating/Heat conducting oil heating | ||
3.Brewhouse System | 01.Mash/lauter Tank (or Mash tun) | |
02.Kettle/whirlpool Tank (or Lauter tun) | ||
03.Hot water Tank ( or Kettle/whirlpool Tun) | ||
04.Wort pump | ||
05.Hot water pump | ||
06.Work platform | ||
07.Plate heat exchanger | ||
4.Fermenting System | 01.Fermenter | |
02.Yeast feeding tank | ||
03.Sanitation hose | ||
5.Cooling System | 01.Chiller machine | |
02.Ice water tank | ||
03.Ice water pump | ||
6.CIP System | 01.Sterilizing tank/Alkali liquor Tank | |
02.CIP trolley | ||
03.Washing pump | ||
7.Control System | Control cabinet(PLC Temperature and Pressure control) | |
8.Accessory | Valve, pipes,spare parts |
a.) Free consultation service before, during, and after sales;
b.) Project planning and design services;
c.) Free debugging instruction of equipment until everything is functional;
d.) Management of equipments' long distance shipping from seller's factory to named port or station by buyer;
e.) Training of equipment maintenance and operating personally;
f.) New production techniques;
g.) Provide 36 months complete warrantee for main parts and life-time maintenance service;The seller is responsible for the nature damage of the machinery in the warranty period except for man-made damage. All spare parts and wearing parts are attached with the machinery for free;