Gree sea water source AC 12v marine air conditioner for yachts and boats
360 degree air blowing.
Outlay electric box for easy installation & maintenance.
Low start-up current thanks to power delay control design.
Forced operation available for emergency situation.
LCD display of operation status. Highly anti-corrosion special spray processing on the complete unit.
Nickel-Copper tube-in-tube heat exchanger for sea water side. All-copper fined tube heat exchanger for air side.
Only one PCB for the entire control and minimize cable connections, with higher reliability and also easier maintenance. Universal for both 50Hz and 60Hz.
Funtion of Gree Marine Air Conditioner
Applied Sites: It is applied for all kinds of ships.
Compact design: It can be installed in incapacious place, like the space under the closet and seats of the ship, which affects the outlook of the ship and is coordinate with the ambience.
Rust prevention and rot-proof: Corrosion-resistant material and the special technics- spray coating on the complete unit are adopted, which enable the unit to be durable.
Unique Structure Design: The angle of supplying air of indoor fan can be 0°.90°.180°.270°,which is convenient for connecting duct.
Two Exhaust Outlets: The condensate can be drained in time no matter how ship shakes.
Gree ship boat air conditioner installation
Selecting a good location for your air conditioner is the most important part of your preparation. Be sure to consider the size of the area you are cooling, the air distribution needs, and the size of the unit you have chosen. Keeping in mind that cool air has a tendency to fall; it is highly recommended that you locate the supply air grille as high as possible in the cabin. See diagram below.
The unit should be installed as low as possible, but never in the bilge or engine room areas, ensure that the selected location is sealed from direct access to bilge and/or engine room vapors. installing the unit as low as possible (such as under a v-berth, dinette seat or bottom of a locker) and ducting the supply air as high as possible, creates an ideal airflow condition. this type of installation will prevent short or premature cycling. The unit should be positioned on a firm, level, horizontal surface and the condensate drain line should run downward from the unit to a suitable drain location. Plan all Connections, which must be made including ducting, condensate drain, and seawater in and out, electrical power connections, location of control, and seawater pump placement, to assure easy access for routing and servicing.
No desirable products?
Sourcing assistant>
How to start your business
Step 1
Find your interested products by search keywords
Step 2
Contact the supplier by clicking ”Enquire” or “request meeting” button, otherwise, you also could consult our import consultant.
Step 3
After verifying your email, get response from suppliers or our trade manager will contact you as soon as possible
Step 4
Set up meeting with the Chinese supplier without language barrier