-Make sure the voltage and frequency supply match the ones indicated on the rating plate of the electric vibraotr.
-Insert the power cable through the cable gland. Use only conductors that have a suitable cross-section.
-Connect the lead wire to the pins (as shown in the diagram below) and tighten them with the specified torque.
-Do not forget to fix the earthing cable to the provided studs (compulsory connection)
-Before closing the junction box make sure the cover gasket is properly fitted in order to keep the specified IP protection
-For more details about motor installation refer to product manuals.