The material of temporary demountable bleacher is consisted of structure, footplanks, chairs and guardrails.
structure is made of steel; and footplank is steel or aluminum,
the chair could be plastic or aluminum bench,
and guardrail is iron mesh or square bar.
aluminum footplank: single, double or triple.
The structure is hot dip galvanized,
footplank and guardrail is galvanized steel or anodizing aluminum,
bench chair could be powder coating or anodizing.
chairs is hollow blow molding, anodizing or powder coating.
The first row could be raised up, each row is consisted of 3 footplanks, 0.2m high and 0.75m wide.
accessories: guardrail, handrail, backrest, wheelchair ramp, stairs, vomitory stairs, path.
application: stadium, gymnasium, natatorium, arena, school, sports center, roller-skating rink, football field, soccer field, basketball court, tennis court, volleyball court, baseball field, theather, etc
Specification | |
Product name | 2017 MCTG-201 raised outdoor temporary grandstand demountable bleachers stadium chairs indoor basketball bleacher seating |
Size: | Row depth 600, 750 or 800mm; first row height 400mm, other row height 200mm or 300mm |
Support frame: |
Raw material: Aluminum or steel Surface finish: powder coating or anodizing or hot galvanizing |
Welding: | Welded to meet national standards and local code requirements |
Joint sleeve assembly: | Seat and footboard are used internal splices, two splices with 4 fixed point |
Material of seat: | Nominal 260mm anodized aluminum alloy board with end cap |
Material of footboard: | Nominal 260mm anodized aluminum alloy board with end cap, or two boards. |
Guardrail: | Circular tube and bend tube, or mesh |
Design load:
|
1. dynamic load: 500kg/M2 |
2. static load: 350kg/M2 | |
Design and applicable laws and regulations |
International building code (IBC2003) Architectural structure load standards (GB50009-2012) |
Packaging details |
CKD with brown paper |
Weight: |
Depend on the total length |
Delivery time: | 20 Days |
Loading port: | Jiujiang, China |
Payment: | 30% T/T in advance, 70% balance before shipping |
No. |
Names |
Material specifications |
No. |
Names |
Material specifications |
A |
Deck support |
40*40*2.5 square pipe 45*60*5 angle bar |
I |
Diagonal |
32*2aquare pipe extruded joint |
B |
Deck support |
150*75*3square pipe 60*60*2.5square pipe |
J |
Railing |
∅28*2\∅25*2square pipe |
C |
Deck |
2mm iron plate(extruded) |
K |
Wedge |
∅15*100 |
D |
Step |
40*20saquare pipe 2mm iron plate |
L |
Seating frame |
40*60*2square pipe crossing |
E |
Adjustable jack |
HT250 adjustable nut 45#∅38screw 5MM bottom-bolt |
M |
Wedge |
∅20*100 |
F |
Ring plate |
∅130*5mm extruded |
N |
38*58 plug |
plastic |
G |
Ledger |
∅48*3square pipe extruded joint |
O |
fixedbolt |
∅10*80 expansion screw |
H |
Wedge |
115*30mm(extruded) |
|
|
|
Q: Are you the manufacture or trading company? Which certification do you have?
A: We are the professional manufacturer and 5 years in this industry.
We have got CE, SGS, and TUV certification.
Q: What’s the MOQ, delivery time, shipping terms and payment terms?
A: We can accept LCL and FCL; the first trial order qty can depend on your request.
Delivery date should be 20-40 days. Shipping term normally we use FOB Jiujiang, we can
discuss and quote if you want FOB shanghai. Payment term is 30% T/T and 70% after
inspection before shipment.
Q: Do you have any finished project case? And can you provide the CAD drawing?
A: 2009 Tajikistan national sports centre 25000 sets Capricorn blow moulded stadium seat floor mounted
2010 Yemen's national stadium 26840 sets Aries blow moulded stadium seat lie flat
2010 Bangladesh national stadium 60000 sets Aries blow moulded stadium seat lie flat
2011 Cape Verde national sports centre 15102 sets Virgo blow moulded stadium seat wall mounted
2012 India's harry province stadium 13177sets Aries blow moulded stadium seat lie flat
2013 Indonesia's stadium 14000sets Virgo blow moulded stadium seat wall mounted
2014 Pyongyang in the national stadium 122650sets Virgo blow moulded stadium seat lie flat
Q: how about the warranty details?
A: Our warranty period is 5 years. During the warranty period, for non-artificial damage, we promise the replacement including the spare parts. For artificial damage, we only charge the material cost.