LMS storage system supermarket rack shelf machine rack shelve roll forming machine
1.Machine Introduction
INTRODUCTION
LMS roll forming machine which takes the COPRA, designing software for cold rolling production and applies for the first step of rolling design, calculation, molding technique simulation, blueprint optimization and roller design to rough molding management, digital machining and quality control. LMS applies for the COPRA in the whole process. The greatness of COPRA is combined with LMS's great experience of twenty years completely and this make LMS be with might double in production for clients. Realize your dream with CORPA.
2.Machine Specification
One complete set of production line consist of following units:
SHELF SYSTEM ROLL FORMING LINE
A.Technical Parameter
1. Thickness: 1.5mm - 3.0mm
2. Purlin Length: >3000mm
3. Material: G.I steel, mild steel
4. Horizontal Distance of Punched Hole: 45-500mm
5. Forming Speed: 20m/min
6. Main Power: 20kw
7. Roller Station: 17 nos
B. Working Procedure
Decoiling---Leveling---Punching---Roll Forming---Straightening---Cutting
C .Equipped with PLC system
Components and data
1). Decoiler 1 set
2). Roll Forming Machine 1 set
3). Hole punching, Cutter 1set
4). Run-out table Made by angle iron
5). Length: 6m
6). Electric control
380V, 50Hz Common control Japan Frequency convertor Controller
components: TaiWan Shilin or other brands Length setting by overtravel-limit
switch & baffle
Or Control System. --- By PLC in MITSUBISHI (Japan)+ touchable interface
= HIGH END CONTROL SYSTEM --- Rotary encoder to measure the length.
3.Installation, Maintenance and Operation Training
A, Our engineers and sales team with the customers:
(1) Our engineers in the customers' factory for installation & training.
(2) Our customers visiting our factory for machine inspection.
B, Terms:
--1. Guarantee Period: 1) In correct operation & maintaining, excluded the electric elements, guaranteed
against malfunction due to manufacturing defects for 12 months from thedate of
loading. Repairs will be made free of charge.
2) Repairs will not be performed free of charge even during the guarantee period in
the following circumstances: ? Damage occur due to a natural
disaster. ? Malfunction occurs due to user error. ? Malfunction occurs due to \
modifications. ? Malfunction occurs due to further movement or shipment after
installation. --2. Seller is responsible for installation and adjustment and buyer covers
installation cost as followed by T/T or cash before or on engineers' visit.
1) Round trip air tickets fee
2) At least three stars hotel and food will be charged to the buyer account.
3) The seller technician salary for installation machine: USD 100.00 / person / day
4) Round trip transportation cost from hotel to the buyer factory, necessary communication and insurance, etc.
--3. Buyer must make preparation before seller's engineers visit:
1) Power Supplied: 380V, 50 Hz, 3Phs
2) Underground cable trucking, lubricant greases