Scaffolding Couplers are used to joint two scaffolding tubes externally one to one. They can be flexibly built in vertical, horizontal and diagonal directions by double coupler, swivel coupler, sleeve coupler etc. Therefore, they can be widely used informwork scaffold and other shoring systems.
Product name |
Scaffolding Coupler |
Forming |
Stamping and forged |
Material |
SPHC, Q235, St37-2, SS400, S235JR, S335JR, etc |
Style |
Japanese and British Standard |
Finishing |
Electri Zinc Galv. |
Size |
48.3mm and 48.6mm |
Usage |
scaffolding pipe |
Type |
swivel and 90 degree double coupler |
Item | Surface | Weight | Thickness | Package |
110 Degree Pressed Double/Swivel Coupler 48.6*48.6mm | Electro-Galvanized | 0.66 | 3mm | 30 PCS/BOX,60BOXES/PALLET |
0.65 |
2.75*3mm |
|||
0.63 | 2.75*3mm | |||
0.62 | 2.75mm | |||
0.60 | 2.75*2.5mm | |||
0.58 | 2.5mm | |||
0.56 | 2.2mm | |||
Hot-Dipped Galvanized | 0.67 | 3mm | ||
0.62 | 2.75mm | |||
0.58 | 2.5mm | |||
90 Degree Pressed Double/Swivel Coupler 48.6*48.6mm | Electro-Galvanized | 0.66 | 3mm | 30 PCS/BOX,60BOXES/PALLET |
0.63 | 2.75*3mm | |||
0.65 | 2.75*3mm | |||
0.62 | 2.75mm | |||
0.60 | 2.75*2.5mm | |||
0.58 | 2.5mm | |||
Hot-Dipped Galvanized | 0.68 | 3mm | ||
0.62 | 2.75mm | |||
0.59 | 2.5mm |
Container sizes:
For 20feet container load 25tons-28tons.
For 40feet container load 25tons-26tons.
Other options are available based on customer requests. Please discuss when placing orders.
Q1. Will you delivery the goods on time?
A: Yes,we promise to provide best quality products and delivery in time.
Q2. What is your standard of packing?
A: Original package is steel strip. We can also do package according to customers' request.
Q3. What is your terms of payment?
A: T/T 30% as deposit, and 70% against B/L copy.
Q4. How about your delivery time?
A: Within 15-30 days after deposit or L/C at sight.
Q5. Can you produce according to the samples?
A: Yes, OEM service can be provided.
Q6. What is your sample policy?
A: Free sample is available,customer only need to pay for the express cost.
Q7. Do you test all your goods before shipment?
A: Yes, we have 100% test before shipment.
Contact us
More information please visit us Renqiu Kingwork Steel Co.,Ltd ! NOW CONTACT US!!