Product Name | ALBAIO |
Brand Name | ALBAIO |
Place of Origin | Japan |
use ALBAIO on mortar or plaster board --- new construction case | ||||||||||||||||||
Process Of Painting | Paint | Mixing Ratio | Coating Method | Coating Amount (kg/㎡/one time) | Coating Time | Coating area (㎡/set) | Overcoating Interval(23℃) | Drying time (23℃) | ||||||||||
Surface Preparation | Clean the surface with sanding papers. | |||||||||||||||||
Primer Coating | MIZUKEI W SEALER | 15kg | roller brush | 0.1~0.15 | 1 | 100~150 | >4 hrs. | |||||||||||
Pre-mixed | ||||||||||||||||||
Finishing Coating | ALBAIO | 16kg | roller brush | 0.15~0.2 | 2 | 40~53 | >4 hrs. | >24 hrs. | ||||||||||
water | 0~1.6kg | |||||||||||||||||
use ALBAIO on mortar or plaster board --- repaint case ① | ||||||||||||||||||
Process Of Painting | Paint | Mixing Ratio | Coating Method | Coating Amount (kg/㎡/one time) | Coating Time | Coating area (㎡/set) | Overcoating Interval(23℃) | Drying time (23℃) | ||||||||||
Surface Preparation | Clean the surface with sanding papers. | |||||||||||||||||
Sterilization Treatment | Apply aqueous sodium hypochlorite solution(0.3~0.4%) on the wall.Wash out with large amount of water after drying. If there are a lot of mold,do the above steps twice with 0.5~0.6% aqueous sodium hypochlorite solution. | |||||||||||||||||
Finishing Coating | ALBAIO | 16kg | roller brush | 0.15~0.2 | 2 | 40~53 | >4 hrs. | >24 hrs. | ||||||||||
water | 0~1.6kg | |||||||||||||||||
use ALBAIO on mortar or plaster board --- repaint case ②※the old paint is in poor condition | ||||||||||||||||||
Process Of Painting | Paint | Mixing Ratio | Coating Method | Coating Amount (kg/㎡/one time) | Coating Time | Coating area (㎡/set) | Overcoating Interval(23℃) | Drying time (23℃) | ||||||||||
Surface Preparation | Clean the surface with sanding papers. | |||||||||||||||||
Sterilization Treatment | Apply aqueous sodium hypochlorite solution(0.3~0.4%) on the wall.Wash out with large amount of water after drying. If there are a lot of mold,do the above steps twice with 0.5~0.6% aqueous sodium hypochlorite solution. | |||||||||||||||||
Primer Coating | MIZUKEI W SEALER | 15kg | roller brush | 0.1~0.15 | 1 | 100~150 | >4 hrs. | |||||||||||
Pre-mixed | ||||||||||||||||||
Finishing Coating | ALBAIO | 16kg | roller brush | 0.15~0.2 | 2 | 40~53 | >4 hrs. | >24 hrs. | ||||||||||
water | 0~1.6kg | |||||||||||||||||
use ALBAIO on metal ferrous objects --- repaint case ① | ||||||||||||||||||
Process Of Painting | Paint | Mixing Ratio | Coating Method | Coating Amount (kg/㎡/one time) | Coating Time | Coating area (㎡/set) | Overcoating Interval(23℃) | Drying time (23℃) | ||||||||||
Surface Preparation | Remove rust and peeling paint with wire brush or power tool to make sure that the paint will adhere properly to the surface. | |||||||||||||||||
Sterilization Treatment | Apply aqueous sodium hypochlorite solution(0.3~0.4%) on the object.Wash off lightly with water after drying. If there are a lot of mold,do the above steps twice with 0.5~0.6% aqueous sodium hypochlorite solution. | |||||||||||||||||
Primer Coating | EPOCH MILD #1000 | 15kg | roller brush | 0.1~0.15 | 1 | 100~150 | >4 hrs. | |||||||||||
RMthinner | 0~1.5L | |||||||||||||||||
Finishing Coating | ALBAIO | 16kg | roller brush | 0.15~0.2 | 2 | 40~53 | >4 hrs. | >24 hrs. | ||||||||||
water | 0~1.6kg | |||||||||||||||||
use ALBAIO on metal ferrous objects --- repaint case ②※the old paint is in poor condition | ||||||||||||||||||
Process Of Painting | Paint | Mixing Ratio | Coating Method | Coating Amount (kg/㎡/one time) | Coating Time | Coating area (㎡/set) | Overcoating Interval(23℃) | Drying time (23℃) | ||||||||||
Surface Preparation | Remove rust and peeling paint with wire brush or power tool to make sure that the paint will adhere properly to the surface. | |||||||||||||||||
Sterilization Treatment | Apply aqueous sodium hypochlorite solution(0.3~0.4%) on the object.Wash off lightly with water after drying. If there are a lot of mold,do the above steps twice with 0.5~0.6% aqueous sodium hypochlorite solution. | |||||||||||||||||
Primer Coating | EPOCH MILD #2000 | Main agent | 16kg | roller brush | 0.14~0.16 | 1 (~2) | 112~128 (56~64) | >4 hrs. <240 hrs. | ||||||||||
Hardener | 2kg | |||||||||||||||||
RMthinner | 0~1.5L | |||||||||||||||||
Finishing Coating | ALBAIO | 16kg | roller brush | 0.15~0.2 | 2 | 40~53 | >4 hrs. | >24 hrs. | ||||||||||
water | 0~1.6kg | |||||||||||||||||
※Sterilization treatment prcoess is not necessary in new construction case. | ||||||||||||||||||
Packing Style | ||||||||||||||||||
ALBAIO | 16kg,4kg | |||||||||||||||||
MIZUKEI W SEALER | 15kg | |||||||||||||||||
EPOCH MILD #1000 | 15kg,4kg | |||||||||||||||||
EPOCH MILD #2000 | 18kgset(Main Agent:16kg,Hardener:4kg),4.5kgset(Main Agent:4kg,Hardener0.5kg), | |||||||||||||||||
RMthinner | 16L,4L(A:for spring and autumn,S:for summer,W:for winter,W:quick-drying) |