Panel: | Galvanized Steel with PU foam insulated, 4cm Thickness |
Accessories: | Galvanized Steel, 3 inch/ 2 inch |
Motor: | Power: 110-440V Frequency :50HZ/60HZ |
Operating temperature: | ’-20℃ to 60℃ |
Max. area: | 64 m² |
Opening direction: | Overhead Roll Up |
Wind resistance: | 62-74km/h, 184.9-267.8Pa |
Open Stype: | Sectional, overhead sliding |
Operation: | Manual, Automatic(remote Control) |
Safety System: | Anti-fall device, Anti-collision devices, Snubber, airbag, Anti-torsion spring break device |
Standard Accessories: | Remote control |
Optional Accessories: | Bluetooth, Infrared sensor, wall switch, exterior numerical pad |
Relible properties of security
Jianda industrial door is specially installed prevent prying device to protect your prosperity.
Spring break safety standard
The end of the spring is installed safety device, which can prevent the spring axis and wire rope dropping down once the spring break.
Prevent falling device
Can ectively prevent the door body falling down suddenly once the wire rope break , ensure the safety of person and products.
Airbag Have the airbag protection devices.
Power | 220V/380V |
220V/380V | 20A |
Protection class | IP54 |
Max Brake power(W) | AC380V/50HZ |
Turn the power output torque(rpm) | 60N.m |
Power output maximum speed | 1400r/min |
5. Other Accessories
Q1. How to install your product,is it difficult?
A: Easy to install, just screw, no welding.If you need, installation vedio can be supplied. And you can contact our salesman if you have any question. Of course we can offer on-site installation guide services if you need.
Q2. Whether the money I paid is safe?
A: Of course your money is safe. Our company had been found more than 20 years. A lot of customers know our honest attitude. And you can pay money by alibaba. It can ensure your money's safe.
Q3. Can you do the full set products according to my project drawing?
A: Yes we can, our engineer will check your project drawings to make sure its accuracyfor each different fittings and quantity.
Q4. How about your delivery time ?
A: Loading Port: Shanghai,Ningbo or according to your requirements.General around 15-20 days after sample confirmed.
Q5.how about your payment terms?
A: T/T ( with 30% deposit ),L/C at sight.,Western Union