Product Name | IEC 320 C14 Male Plug to C19 Female Socket AC Power Connector |
Connector Type | IEC 320 C14 Male to IEC C19 Female Adapter |
RATED VOLTAGE | 15A 125V For US market Rated 10A 250V For EU market |
RATED CURRENT | 10~15A |
RATED POWER | 2500W |
Wire Hole Dia | 8mm/0.31" |
Material | NYLON |
Color | Black |
Shipping Methods | Int'l express, By Air, By Sea, By Train | ||
Freight Cost | Prepaid or Collected by Customers | ||
Delivery to Customer | 4-5days after shipment | ||
Packaging | PE bag in carton or as customer's requests | ||
Paper Carton size | 47*32*24cm |
MOQ | 500pcs or as its raw material complexity | |||
Place of Origin | Shenzhen, Guangdong, China | |||
Price terms | EXW, DDU, FOB, CIF, DDP | |||
Payment methods | PayPal, T/T, Western Union, 50% T/T in advance, balance before shipping. | |||
Delivery time | Usually 10-15 business days, On-time delivery | |||
Sample time | Within 5 business days. | |||
Samples | Usually free of charge, charge cost as raw material complexity and samples quantity | |||
Other service | Product sourcing, supplier sourcing |
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and
the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.