Hybrid steam boiler Steam Boiler exceeding 15t per hour Boiler for hotel
Product Name | HYBRID STEAM BOILER STEAM BOILER EXCEEDING 15T PER HOUR BOILER |
Rated evaporation | 15 ton |
Working Pressure | 1.0Mpa,1.25Mpa,1.65Mpa |
Steam temperature | 184℃,193.3℃ |
Fuel Type | Natural gas,LPG,LNG,light oil,heavy oil |
Thermal Efficiency | 95% |
Model | Rated | Rated | Rated | Thermal | Fuel Consumption | Equipment Power | Weight | ||||
Capacity (t/h) | Pressure (Mpa) | Temperature (C) | Efficiency (%) | Light Oil (Kg/h) | Natural gas (Nm³/h) | Burn Light Oil | Burn gas | (t) | |||
WNS1 | 1 | 0.7/1.0/1.25 | 170/184/194 | >90 | 45-100 | 18-100 | 1.5 | 1.5 | 4 | ||
WNS2 | 2 | 1.0/1.25/1.6 | 184/194/204 | >90.2 | 137.09 | 165.97 | 2.2 | 3 | 8 | ||
WNS3 | 3 | >91 | 205.75 | 249.6 | 7.5 | 7.5 | 9 | ||||
WNS4 | 4 | >91 | 272.3 | 329.5 | 9 | 7.5 | 13 | ||||
WNS5 | 5 | >91.5 | 134-402 | 80-500 | 17.2 | 15 | 15 | ||||
WNS6 | 6 | >91.5 | 134-402 | 8-500 | 15 | 15 | 17 | ||||
WNS8 | 8 | 1.25/1.6/2.5 | 194/204/225 | >91.6 | 523.4 | 631.5 | 26 | 22 | 21 | ||
WNS10 | 10 | >91.6 | 212-890 | 150-1085 | 26 | 22 | 22 | ||||
WNS12 | 12 | >91.8 | 915.5 | 1090 | 26 | 22 | 27 | ||||
WNS15 | 15 | >91.8 | 931.5 | 1094.4 | / | / | 34 | ||||
WNS20 | 20 | >92 | 1380.33 | 1598.44 | / | / | 45 |
Safety--Protection
The gas(oil) fired condensation integrated steam boiler is designed with the excellent safety protection functions: burner ignition protection, steam over pressure protection, water level detection and interlock protection.
High efficiency--Energy saving
The steam boiler with center adjustment wet back three pass structure. The boiler is designed with the large furnace. The large furnace and adequate smoke tube effectively increase the radiation heating surface and improve the thermal efficiency of the boiler.
Intelligent control
The boiler is equipped with advanced automatic control system with the control mode of PLC + touch screen. Our company designs our control system in consideration of independent intuitive operation and expansibility.
NO. | Item | Unit | Qty | Origin | ||||
Boiler Main Body | ||||||||
1 | Boiler Main Body | Set | 1 | Our Company | ||||
Auxiliary Main Parts | ||||||||
1 | Oil Gas Burner | Piece | 1 | Italian import | ||||
2 | Control Cabinet | Piece | 1 | Our Company | ||||
3 | Water Treatment | Piece | 1 | Fleck | ||||
4 | Stainless Pump | Piece | 2 | Our Company | ||||
5 | Chimney | Piece | 1 | Our Company | ||||
6 | Steam header | Piece | 1 | Our Company | ||||
Valves&Instruments | ||||||||
1 | Valves&Instruments | Batch | 1 | Our Company |
Water level gauge,water level sensor,pressure gauge,safety valve,three way cock,stop valve,check valve,blow-down valve and so on.
Our company offers all kinds of boiler accessories at the same time, if necessary, please contact us,we will do our best to serve you.
1. Before the transportation of this product, the factory has conducted comprehensive debugging on the control box, safety valve, pressure controller and water pump of steam boiler.
2.In general, as long as the water and fuel are connected as shown in the diagram, the button of the control box can be opened, which can enter fully automatic operation without user recommissioning.
3.The water treatment equipment is indispensable, the water softener can eliminate the damage caused by the scale to the boiler, save energy consumption and prolong the life of the boiler and obtain higher operating efficiency.
1.The boiler body
2.The burner
3.Boiler controller
4.Feed water pump
5.Steam header
6.Water treatment system
7.Soften water tank
Boiler host is packaged with dust bag.
Boiler Accessories is packaged in wood box.
We have the most reliable transportation to make sure your goods arrived your destination as soon as possible.
Cart transport to Qingdao port, Tianjin Port and Shanghai port.
Identify the type of boiler you want(steam boiler or hot water boiler).
The boiler capacity,pressure,and fuel(oil,gas,biomass,coal),or you can consult us.
Guide installation online or we can provide staff installation by our staffs, but you have to afford the extra cost if If we send professional staff overseas to install it.
Generally, it will take 20 to 40 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
We will supply professional after-sale service team as soon as we receiving your problem feedback, we will dispatch our engineers to your country and solve your problems right now.