Industrial Sausage cutter machine/ meat bowl cutter
1. Machine introduction of Sausage Cutter Machine
The high-speed rotation of bowl cutter’s blade shortens the processing time and limits the temperature rise, which realizes full protein abstraction, perfect elasticity, sufficient emulsification and high productivities. Jixiang bowl cutter is made of quality stainless steel with rational construction, high processing accuracy, comfortable operation and easy maintenance.
2. Technical parameters of Sausage Cutter Machine
Model |
ZB20 |
ZB40 |
ZB80 |
ZB125 |
Capacity(kg/time) |
10-15 |
20-30 |
40-50 |
70-80 |
Pot Volume(L) |
20 |
40 |
80 |
125 |
Power(kw) |
1.85 |
6.25 |
15 |
22 |
Chopping Knife Amount |
3 |
3 |
6 |
6 |
Chopping Knife Speed (r/min) |
1650/3000 |
1650/3000 |
126/1650/3600 |
126/1650/3600 |
Chopping Pot Speed (r/min) |
16 |
12 |
8/12 |
8/12 |
Dimension(mm) |
770*650*980 |
1245*810*1094 |
2300*1202*1195 |
2400*1420*1300 |
3.Contact information of Sausage Cutter Machine
If you need further information, please contact us freely, we will do our best to cooperate with you.
Q: Payment?
A: 50% by TT as deposit on signing the contract, 50% by TT as final payment of balance should be paid before the goods leaving the factory.
Q: What about Warranty? And what will we do if the machine is broken down?
A: The warranty period for all of structural and mechanical equipment is one year. The warranty period for all electric motors is half one year. Wear parts are not covered by warranty unless the component part is found to be flawed.
Q: What should we need to do for if we want to get a best quotation?
A: Hi, if you want us recommend a suitable type for you, please let us know the details as follows:
1) The capacity (tons per hour/ kgs per hour ) do you need?
2) What's your main raw materials?(Meat? Vagetables? or others?)
3) The size of the finished products?
Q: Delivery time?
A: Standard delivery time is within 15 working days from receipt of deposit, the whole set of food processing plant equipment is within 30 working days.