Enquiries
Message
Home > Products > Construction & Real Estate > Formwork
Hot sale solid engineering dedicated peri shuttering panels slab formwork for concrete
  • Hot sale solid engineering dedicated peri shuttering panels slab formwork for concrete

Hot sale solid engineering dedicated peri shuttering panels slab formwork for concrete

FOB Reference Price
Purchase quantity ()
Minimum order quantity
Payment
Meo Food Co., Ltd.
Meo Food Co., Ltd.
China - Hangzhou
Trading Company
Trade Capacity
Export Percentage
0-30%
Nearest Port
Penang, Valparaiso,Jetta
Accepted Delivery Terms
Employees
501-1000 people
Accepted Payment Currency
USD,EUR
Average Lead Time
5 Day(s)
Certifications
Product Specifications
--
Product Description
Overview
Quick Details
Type:
Formwork
Warranty:
3 years
After-sale Service:
Free spare parts, Online technical support, Onsite Inspection, Onsite Installation, Onsite Training
Project Solution Capability:
3D model design, Cross Categories Consolidation, graphic design, total solution for projects
Application:
Apartment, Building Construction(Villas, Apartment, High-Rise Building)
Design Style:
Modern
Place of Origin:
Jiangxi, China
Brand Name:
GETO
Model Number:
6061
Formwork Panel Material:
Aluminum Alloy 6061-T6
Formwork Panel Thickness:
4mm
Frame Height of Formwork Panel:
63.5mm/65mm
Formwork Panel Weight:
22-25kg/㎡
Formwork Panel Bearing Capacity:
60KN/㎡
Formwork Panel Surface Treatment:
Mill/Coated
System Type:
Tie-Rod System/Flat-Tie System
Usable Range:
Wall, Column, Beam, Slab, Staircase
Usable Life:
300 times
Supply Ability
Supply Ability:
500000 Square Meter/Square Meters per Month
Packaging & Delivery
Product Description

GETO focus on creating High-End brand of construction aluminium formwork

 

Offer you the Total Solutions of Aluminum Formwork System with superior quality & competitive price

 

Providing one-stop service, GETO Aluminium Formwork let you more assured and comfortable.

 

 

 Aluminium Formwork Benefits

Items Aluminium formwork
1. Material Aluminium alloy 6061-T6
2.Installation

After short period of training, workers can easily learn to install and dismantle the formwork.

3.Construction period 3-5 days per storey.
4.Machine assistance

Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used, such as:

1) Shifting of reinforcing steel rebar into assembly point

2) Removing debris from site

3) Loading and Unloading materials from trucks into site storage area.

5.Quality of formwork The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won’t be wasted.
6.Plastering cost As the smooth effect after removing the formwork, there is no need to plaster.
7.Formwork stability The load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting.
8.Scrap value The scrap value is about 50% of the new panel.

 

 

Product Overviews

 

 

 

Company Information

 

 

 

Project site

If clients require, GETO can provide specilist to project site for guidance, and GETO will invite clients' site supervisor and workers to factory for learning and training.

 

 

 

 

Construction Effect

 

After dismantle aluminium formwork, it can control flatness and verticality in less than 5mm,

the wall surface is very smooth, one-time pouring molding,

without plastering and second work, saving construction time, energy as well as cost.

 

 

 

 

Our Services

1. Your inquiry related to our product & price will be replied within 24hours.
2. Well-trained & experienced staff are to answer all your inquiries professional in English of course.
3. Working time: 8:00am - 18:30pm, Monday to Saturday.
4. OEM is highly welcomed. We have strong R&D team here to help.
5. Your business relationship with us will be confidential to any third party.
6. Good after-sale service offered, please get back if you got question. 

7. Mock up/pre-assemble in factory before delivery to avoid some mistakes in advance.

 

 

 

  

Exihibition Show

GETO takes each opportunity to expand business and bring our products new technology to the world, providing the best after-sales service and create the biggest value and benefits to our clients. We attended oversea exhibition fair every year, in order to let more and more clients to know GETO...

 

 

 

Packaging & Shipping

PACKAGE:

Standard export carton packing.

DELIVERY TIME:

Within 5-20 days after confirming order,detail delivery date should be decided according to different projects and order quantity.

 
FAQ

 

-Q-:Can I use this set of formwork to another project?

Yes, there are nearly 70% standard panels can be common reused.

-Q-:What's your packing methods?

Protection foam+heat contracted plastic film. / wooden packing(non-fumigation) / Metal pallet or depend on clients special requirement.

-Q-:What's your payment terms?

T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/ C  100%, or negotiate according to the order status

-Q-:Are you manufacturer or trader?

A: GETO is the manufacturer of aluminum formwork system for 9 years. Our group has 4 factoriescove raged every scaffolding systems.

-Q-:If I don't have construction crew knew well about your forwmork system, what can I do?

Well, we will send one or two field specialists to your construction site for guidance if you require.

-Q-: Do you have pre-mocking up service?

 Yes, we have pre-mocking up service, it depends on customer, sometimes, our clients need the cargo urgently,

then they do not need pre-mocking up, normally, we will do pre-mocking up to our customers.

-Q-: How to proceed an order for aluminum formwork?

1- Please provide completed project drawings to us.

2- GETO design engineer will work out formwork solution base on project drawings, we have a meeting to discussing details solution.

3- Construction details confirmed, sign sales contract, receiving deposit.

4- To work out shell drawings and modulation drawings.

5- Have meeting for confirming model details.

6- Production.

7- Acceptance and check.

8- Shipping.

 

 How to contact us?

Send your inquiry details in the below for "free sample", click "Send" Now !!!
 

 

No desirable products?
Sourcing assistant>
How to start your business
  • Step 1
    Find your interested products by search keywords
  • Step 2
    Contact the supplier by clicking ”Enquire” or “request meeting” button, otherwise, you also could consult our import consultant.
  • Step 3
    After verifying your email, get response from suppliers or our trade manager will contact you as soon as possible
  • Step 4
    Set up meeting with the Chinese supplier without language barrier
Send Enquiry
ToXun Cao
Meo Food Co., Ltd.
Enquire
Related Categories
BuildingGlassCeilingsCornerGuardsDoor,Window&AccessoriesRealEstateSunrooms&GlassHouses
Popular Searches
mivan formworkosb formworkzoom forkaari work* reworkbeamsworkmetal formworkgates formworkxcr forkformwork toolsgotta workcermarkpile formworkfoam formworkvorwerkmeva formworktable formworkgotta workbeam formworkzoo yorkformwork plankdri workperi formworkmeva formworkzari worksbeam formworkpororozari workfoam swordsoapwortgotta workdri workgotta workdri workosb formworkzari workearmorekomarkformwork pinsbrick formwork