Hot dipped galvainzed spike Pointed Flag Poles Ground anchor
Specification | Ground screws |
Length | Usual type: 1600 /1800 /2000mm ( 550mm-4000mm ) |
Outer Diameter | 48 /60 /68 /76 / 89 /114mm |
Pipe thickness | 2.5 / 3.0 / 3.5 / 3.75 / 4.0 mm |
Depth | 500~3000mm |
Material | Q235 ISO630 Fe A / DIN EN10025Fe 360 B |
Surface Treatment | Hot dip galvanized to DIN EN ISO 1461-1999. |
Top Design: | Flange ( or 3*M16) |
Screw spacing | 40 / 60 mm |
Packing | on steel pallet ,in carton or as your request |
1.High work speed modern foundation construction without concrete, high installation capacities with machinery
2.Reliable quality welding quality strictly conform with international standard. smooth HDG surface, DIN EN ISO1461
3.Low cost of foundation screw is much lower than traditional concrete foundation
4.Environment friendly high stability, efficiency and suatainablity, without any digging or concreting.
Extensive Application | ||
• Bus shelters | • Bollards & Barriers | • Parking meters |
• Street lights | • Guard rails | • Directional & Traffic signs |
• Solar lights | • Sound barriers & Screens | • CCTV & surveillance systems |
• Roadside fences | • Boardwalks | • Other building |
How to buy your ideal products?
You can provide us your drawing, and we will produce as your drawing.
Or we can design as your requirements if you do not have a clear plan.
How to pay?
TT and L/C are acceptable and TT will be more appreciated.
What is the delivery time?
It depends on order quantity.
Generally, the delivery time will be within 10 to 15 days.
How about our product quality?
Our ground screw piles are manufactured with first quality materials
(hot dip galvanized complying with the ISO 1461:1999).
What is steel quality?
This system is built from Q235 steel conical pipe with welded blades,
and can be applied in a wide variety of different geological locations.
What is the thickness of galvanization?
More than 60μm in general.
Can we install PowerScrew by ourselves ?
Of course.
We will provide equipment and installation guide to every customer.
How to order from Zhiyi ?
Buyer Send Enquiry →Get Zhiyi Quotation → Order Confirmation
→ Buyer Arrange 30% Deposit → Production Started upon Receipt of Deposit
→ Strict Inspection during Production → Buyer Arrange Balance Payment
→ Packing → Delivery as per Trade Terms (FOB/CFR/CIF)