roduct name | custom metal logo labels for handbags |
Usage | Clothing,handbag,wallet |
Material | Zinc alloy |
Color | As photo,according to to the pantone color,can be custom |
Size | customized |
Lead time | For samples,7-10 days,for bulk order,10-15 days |
Payment | T/T(30% deposit),Western union,Credit card |
MOQ | 500 pieces |
QC contral | 100% inspection before packing,Spot inspection before shipment |
Shipping |
1.A. By air or sea or combined transportation. B. By Express(DHL,TNT,UPS,FedEx,EMS,SF) |
Stamping workshop
Machine quality: 10 stamping machines
Supply ability: 300000pcs stamping and punching aglets
Die-casting workshop
Machine quality: 5 diecasting machines
Supply ability: 50000pcs zinc alloy aglets
Painted workshop
Machine quality: 1 spray painted automatic machine
Supply ability: 70000pcs painted aglets
The ERP Management System----
we developed by ourselves, all of the procedure are controled by ERP system, from quotation-order-purchasing-production-delivery. The ERP keeps all the information, quotation record, order record, production records, and also the account record, so no matter 4 or 7 days later, we can find all the record easily and fast.
our products and service
1,metal shoelace aglet was used in shoes for bootlace
2,it has many size:15mm/17mm /20mm /23mm
3,it has made in brass and can't rust
4,professional electroplated and well polished
5,it won't rub off and very durable
6,high precision and surface smooth
FAQ
Q1:Can you ensure the quality?
A1:Of course, we are the metal products manufacture,so we can ensure the quality and also can give you the reasonble price."Quality is the first"is our purpose.
Q2:If i want make my own logo,How many days to open mould? And the cost?
A2:It will take about 7-10days ,the cost need according to your design.
Q3:What information shall we provide before open mold?
A3:Please confirmed your draft's size and logo pattern.
Q4:How is your quality control system?
Q5:Could you provide SGS report?
A5:Yes ,all our products are passed Eco friendly test ,comply with the EU Environmental requirement.
Q6:How is the lead time?
A6:Up to order quantity ,Usually 7-13days to deliver .
Q7:How is the shipment way?
A7:For sample and small order DHL; FEDEX;TNT UPS; or by air; For bulk by sea ..we can also discuss the ways with custom.
Q8:What about the payment?