Enquiries
Message
Home > Products > Machinery > Food & Beverage Machinery > Baking Equipment
Hot Asahi Beer Tower Beer Brewing Equipment
  • Hot Asahi Beer Tower Beer Brewing Equipment

Hot Asahi Beer Tower Beer Brewing Equipment

FOB Reference Price
Purchase quantity ()
Minimum order quantity
Payment
Meo Textile Clothing Co.LTD
Meo Textile Clothing Co.LTD
China - Hangzhou
Manufacturer
Trade Capacity
Export Percentage
Nearest Port
shanghai,ningbo
Accepted Delivery Terms
Employees
101-200 people
Accepted Payment Currency
USD,CNY
Average Lead Time
60 Day(s)
Certifications
Product Specifications
--
Product Description
Overview
Quick Details
Processing:
Fermenting Equipment, Gernemy
Condition:
New, new
Place of Origin:
Shandong, China
Brand Name:
Humber
Model Number:
HB-2000L
Processing Types:
Alcohol
Voltage:
220V
Power:
80KW
Dimension(L*W*H):
110M*3
Weight:
7230KG
Warranty:
12 months
After-sales Service Provided:
Engineers available to service machinery overseas
Certification:
CE;ISO9001-2008
Heated way:
electricity or steam heating
material:
red copper
asahi beer tower:
common
Supply Ability
Supply Ability:
10 Set/Sets per Day Beer Brewing Equipment
Packaging & Delivery
Product Description

Beer Brewing Equipment Manufacturer. Whole Beer Production Line Can Be Supplied. Welcome To Visit us At Any Time.

 

Here we will introduce our self and our equipment in details to you. Please be patient, lets begin with

brewing process:

Milling:

Here, malt is grinded and malt husks are cracked.  It makes mashing faster and makes filtration of mashing easier.

 

Mashing:

Mashing is the process of mixing milled malt and water, then heat this mixture. Mashing allows the enzymes in the malt to break down the starch in the grains into sugars. Mashing involves pauses at certain temperature(notably 45-62-73 or 113-144-163). Mashing takes place in mash kettle.

 

Lautering:

Lautering is the separation of grains and liquid. The bottom of lautering kettle has thin slits to hold back the solids and allow liquids to pass through. The mash itself functions as a sand filter to capture mash debris and proteins through recirculation. Grain washing also takes place in the lautering tank.  After the wort runs-off, trickling water will goes through the grain to extract sugars.

 

Boiling:

After lautering, the wort will be boiled with hops ( and other flavouring if needed). Average boiling time ranges from 45 to 90 minutes, depending on its intensity, the hop addition schedule and water volume. 

 

Whirlpool:

At the end of the boil, solid particles in the hopped wort are separated from whirlpool tank. Then wort will be cooled when runs into the fermentation tank through the plate heat exchanger.

 

Fermentation:

It takes place in fermentation tank. Sugar in wort will be transformed into ethyl alcohol by respiratory action of yeast. At same time, some other chemical and physical reaction happens too. Wort turns into beer gradually under these reactions.

 

After fermentation, we can drink beer directly or put beer into BBT via filtering equipment.

 

These processes are finished in several tanks. Tank quality can be customized.

 

Brewing System:

Machine Part

Item

Remark

Malt milling system

Malt mill

Double/four roller, with grist hopper, hydrator

Mashing system

Mash tun

Stainless steel

 

With agitator

Lauter tun

Stainless steel

 

With agitator

Kettle/Whirlpool

Stainless steel

 

Steam/electric heating

Hot water tank

Stainless steel

Steam/electric heating

Wort Pump

Stainless steel

Hot water pump

Stainless steel

Heat Exchanger

Stainless steel

Double stage/single stage

Mashing Pipes

Stainless steel

Working platform

Stainless steel

Fermentation system

Fermentation tank

Stainless steel

Dimple plate cooling jacket

Bright beer tanks

Stainless steel

Dimple plate cooling jacket

Conical/domed bottom

Yeast Tank

Stainless steel

Beer Pipes

Sanitary tube, Plastic.

Coolant Pipes

Stainless steel

Insulation Pipes

Polyurethane

 Cooling system

Ice Liquor Tank

AISI 304 Stainless steel

Double layers, polyurethane

Capacity being confirmed as actual cool requirement

Chiller

Assembly unit

Ice Liquor Pump

Stainless steel

Pipes/Valves

Stainless steel

CIP system

CIP station

 Stainless steel

Include alkali, acid, sterilize hot water tank etc.

Control system

Control Cabinet

Stainless steel

With power control

Touch Screen

PLC control

Product Description2

Main Equipment:

1. Malt Milling System

Malt Mill: Material: carbon steel and chrome plate roller;

Double roller type malt mill machine;

Equipped with motor, belt pulley, belts, etc;

Working capacity, power and dimension is decided according to mashing system.

 

2. Mashing System

Mashing Tank:

Inner-Jacket(SUS304 SS)thickness: 2.5mm;

External-Jacket(SUS304 SS) thickness: 1.5mm;

Mushroom-shaped head (SUS304 SS) thickness: 2.5mm;

Insulation layer: PU-thickness: 80mm;

Lauter tank equipped with plow knife;

CIP cleaning ball: Material: SUS 304; Comprehensive cleaning;

Polishing precision up to: Ra0.6µm;

Outsourcing surface: Plate protection and sand polish on welding seal.

 

Whirlpool Tank:

Inner-Jacket(SUS304)thickness: 2.5mm;

External-Jacket(SUS304) thickness: 1.5mm;

Mushroom-shaped head (SUS304) thickness: 2.5mm;

Insulation layer: PU-thickness: 80mm;

Heating way: electricity heating/steam heating;

Exhaust chimney for condensate;

CIP cleaning device: Material: SUS 304; Comprehensive cleaning;

Polishing precision up to Ra0.6µm;

Outsourcing surface: Plate protection and sand polish on welding seal.

 

3. Fermentation System

Fermentation Tank:

Material: Inner (SUS304)thickness: 2.5mm;

External-Jacket(SUS304) thickness: 1.5mm;

Oval head cone bottom, thickness: 2.5mm.

Insulation: Polyurethane-thickness: 80mm.

Cooling way: Ice water belt cooling;

Design pressure 0.3MPa; Working pressure 0.15Mpa.

Spray ball for cleaning, comprehensive cleaning.

Foot bolt: Adjust the height of the equipment, easy to install

 

Yeast Adding Tank: 

Material: SUS304

Adopts SUS 304 stainless steel fine polished process, outsider stainless steel polishing, have three connection mouths

Adding yeast sight glasses, aseptic air mouth, and wort pipe connection mouth

 

4. Cooling System

Ice Water Tank:

Inner-jacket (SUS304) thickness: 3.0mm;

External-jacket (SUS304) thickness: 1.5mm;

Insulation: Polyurethane-thickness 80 mm;

Internal and external plate protection and sand polish on welding seal;

Temperature mode: PT100 temperature probe, temperature transmitting, temperature control panel display.

Feeding method: Ethylene glycol or alcohol water fill into the tank from the top manhole. Refrigeration water fill into ice water tank from the top manhole.

Discharging method: Ethylene glycol water discharge from the ethylene glycol outlet on bottom of ice water tank. Refrigeration water discharge from the refrigeration water outlet on bottom of ice water tank.

 

Refrigerating unit:

Its power and working capacity will be decided according to whole brewing system.

 

5. CIP System

Disinfection Tank:

Material is SUS304;

Thickness is 2mm;

Weld slinging band;

Material all adopt the international standard of 304 stainless steel, all welding are argon protection single-sided, double-sided forming.

 

Alkali tank:

Material is SUS304;Thickness is 2mm;

Weld slinging band;  Valves, accessories supporting;

Material all adopt the international standard of 304 stainless steel, all welding are argon protection single-sided, double-sided forming.

 

6. Control System

Control Cabinet:

All specification is decided according to whole brewing system.

 

Company Information:

Jinan Humber equipment technology co., ltd is one professional beer brewing equipment manufacture in China. We specialize in personally manufacturing small, medium and big sized brewery plants. We also manufacture all types and sizes of fermenting and storage tanks. Our breweries can be designed according to the specific wishes of our customers. We also can offer you a wide variety of technical solutions. We can provide beer to make by fermentation of the equipments of having, can train to make wine teacher.

 

 

 

 

Packing & Shipping

 

Certificate:

 

Why Choose US?

Why Choose US?

1. Professional manufacturer. Design specifically for you.3D & CAD drawing can be offered.
2. Products are 100% tested.
3. Engineer & training available.
4. 30 days delivery time.
5. 5 years warranty.
6. 7*24 hours service.
7. L/C is available
.

No desirable products?
Sourcing assistant>
How to start your business
  • Step 1
    Find your interested products by search keywords
  • Step 2
    Contact the supplier by clicking ”Enquire” or “request meeting” button, otherwise, you also could consult our import consultant.
  • Step 3
    After verifying your email, get response from suppliers or our trade manager will contact you as soon as possible
  • Step 4
    Set up meeting with the Chinese supplier without language barrier
Send Enquiry
ToEric Zhang
Meo Textile Clothing Co.LTD
Enquire
Related Categories
FishProcessingMachinesFoodSterilizerFruit&VegetableProcessingMachinesPasteurizerPetFoodProcessingMachinesSeasoningProcessingMachines
Popular Searches
tea bottling equipmentsoda bottling equipmenttai chi equipmentpig tattoo equipmentholistic equipmentspeed skating equipmentboxing linimentgroup training equipmentradio test equipmentmatrix gym equipmentbin cleaning equipmentcamping equipmentras equipmentbaking cupstitle boxing equipmenteuro fitness equipmentkitchen equipmentdosing equipmentiptv equipmentcombine shipmentsoil sampling equipmentreception equipmenttakoyaki equipmentlapidary equipmentpaint testing equipmentegg farming equipmentsnake handling equipmentipx9k test equipmentdouble glazing equipmentsolvent drying equipmentx force equipmentshopping mall equipmentsdog park equipmentprp equipmentking puppetlogging equipmentneon sign making equipmentbouncer equipmentused bakery equipmentgas plant equipment