Enquiries
Message
Home > Products > Machinery > Refrigeration & Heat Exchange Equipment > Cold Room
Horizontal Industrial wood coal and biomass fuel boiler
  • Horizontal Industrial wood coal and biomass fuel boiler

Horizontal Industrial wood coal and biomass fuel boiler

FOB Reference Price
Purchase quantity ()
Minimum order quantity
Payment
Meo Textile Clothing Co.LTD
Meo Textile Clothing Co.LTD
China - Hangzhou
Manufacturer
Trade Capacity
Export Percentage
Nearest Port
shanghai,ningbo
Accepted Delivery Terms
Employees
101-200 people
Accepted Payment Currency
USD,CNY
Average Lead Time
60 Day(s)
Certifications
Product Specifications
Model Number
DZL
Product Description
Overview
Quick Details
Applicable Industries:
Hotels, Garment Shops, Manufacturing Plant, Food & Beverage Factory, Farms, Restaurant, Home Use, Printing Shops, Construction works , Energy & Mining, Food & Beverage Shops
Showroom Location:
None
Video outgoing-inspection:
Provided
Machinery Test Report:
Provided
Marketing Type:
New Product 2020
Warranty of core components:
1 Year
Core Components:
Other
Condition:
New, New
Type:
Natural Circulation
Usage:
Industrial
Structure:
Water Tube
Pressure:
Low Pressure
Steam Production:
Max. 20t/h
Style:
Horizontal
Fuel:
Coal-fired
Place of Origin:
Jiangsu, China
Brand Name:
wilford
Output:
Steam
Dimension(L*W*H):
Depends
Weight:
1-20 Ton
Warranty:
1 Year, 12 Months
Key Selling Points:
High Safety Level
Application:
rice mill,food,textile,printing,etc
Keywords:
coal biomass boiler
Color:
Customer's Requirement
Design fuel:
biomas
factory:
wilford
Thermal efficiency:
82%
Working Pressure:
0.7---2.5Mpa
Rated evaporation:
1-20t/h
After Warranty Service:
Online support, Spare parts, Field maintenance and repair service
Local Service Location:
None
After-sales Service Provided:
Engineers available to service machinery overseas
Certification:
ISO CE SGS
Supply Ability
Supply Ability:
10 Set/Sets per Year
Packaging & Delivery
Product Description

Horizontal Industrial wood coal and biomass fuel boiler 

Product Description

1.The boiler adopts the latest research results,such as:arched tube plate,screw thread smoke tube,hot water boiler backwater ejection technology,solves the pot type boiler tube plate crack at the lower part of the drum,drum kits,water wall tube broken ,low  thermal efficiency,low output,poor adaptability of coal.

 

2.Combustion:fuel from coal scuttle fall in front of the stove grate,during operation ,after coal  preheating and dry distillation,ignition,combustion,the slag drop  into the slag bucket,then been removed out furnace by by slagging machine at any time.Furnace arch uses herringbone arch,improving the conditions of ignition.Flue gas forms vortex between the throat of  the front,rear arch  mixed with air.After combustion ,flue gas enters  the two wings flue,through the front smoke box into the thread smoke tube,then go through cast iron economizer(hot water boiler no need )dust collextor,finally discharged by lead fan to  chimney.

 

3.Boiler water circulation  progresses on natural circulation and ejection. The radiation heating surface is  left and right side cold water  wall  .The two wings of boiler furnace are main  convection heating surface.The thread smoke tube in boiler furnace are  convection heating surface.The boiler furance is seperated by  fold smoke wall-firebox and reburning chamber .Boiler main body is covered by  three-dimensional shape plate shell

 

Technical Parameter

  Type DZL1 DZL2 DZL3 DZL4 DZL6 DZL8 DZL10
Project Unit
The enaporation T/h 1 2 3 4 6 8 10
The rated steam pressure Mpa 0.7,1.0,1.25,1.6,2.5
The rated steam temperature 170,184,194,203,226
Feed temperature 20,60,105
Avaible fuel (AⅡ)
Design the thermal efficiency % 80.2 80.1 80.3 80.6 80.3 80.5 80.6
The fuel consumption  Kg/h 181 378.4 493 723 1089 1509 1750
The  transport dimension
L*W*H(mm)
mm

5200*2100

*3000

5525*2440

*3400

6300*2650

*3400

6081*2575

*3400

8000*2900

*3550

7526*3340

*4300

8980*3200

*3550

Boiler installation structure                                    The  fast                                 The   assembly

 

 

 

Please contact us for more product information. contact us >>
Related Products

Company Profile

FAQ
Q: Are you a factory or a trading company?
 A: We are a 20-year-old industrial boiler factory , specializing in gas oil diesel electric fired boilers. 
Now we are one of leading industrial boiler manufacturers in China.

Q: What is the Warranty for the boilers?
A: Our steam boiler warranty is one year, During the warranty period, any parts damaged, you can get a new 
parts for free.

Q: How long should we wait for delivery?
A. Usually it will take about 35-45 days for pressured boilers, If you need to change the voltage or pressure, it
need more time.

Q: What about your payment term?
A: Usually it would be 30% deposit payment, 70% balance before delivery. We accept T/T, L/C and other
payment way.
No desirable products?
Sourcing assistant>
How to start your business
  • Step 1
    Find your interested products by search keywords
  • Step 2
    Contact the supplier by clicking ”Enquire” or “request meeting” button, otherwise, you also could consult our import consultant.
  • Step 3
    After verifying your email, get response from suppliers or our trade manager will contact you as soon as possible
  • Step 4
    Set up meeting with the Chinese supplier without language barrier
Send Enquiry
ToEric Zhang
Meo Textile Clothing Co.LTD
Enquire
Related Categories
HeatExchangerIndustrialAirConditionersIndustrialChillerIndustrialFreezerRefrigeration&HeatExchangePartsLyophilizer
Popular Searches
bifold doornoble doortoledo stoolcold room ukcold roomsalt roomgold sonamood condomsgold pom pomsholly rootcoir broomgold probecondo doorboard bookgold spoongolden hoodgold vodkacold cowold boltgolden condompolo bootsgold epoxysock loomsgold groutgold visorbold lockshard broompooja roomcold room doorgold visorgold condomsyard broomgold hogfood boothgold corollawood boomgold oboegold sofatoad venomroland motor