Our products:
1. Pre treatment coating series: physical various treatment, including sand blasting and shot blasting; chemical passing through spraying type, tank immersion type, tank immersion spraying type.
2. Electrostatic powder coating series: all kinds of imported, domestic, manual,
automatic powder spraying equipment, all kinds of material powder spraying chamber, pulse recovery, multi-tubed cyclone + filter core, cyclone + bag recovery device.
3. Immersion, painting and coating series: all kinds of imported, domestic, manual, automatic painting equipment,manual, cup type electrostatic painting equipment, dry type, water curtain type, water-rotating type, whirlwind vortex volume, telescopic, Ω type, these kinds of painting booth, all sorts of circulating varnished slots.
4. Coating production line: drying, curing system, strong far infrared electric heating, energy-saving coal, coal gas (gas,LPG, natural gas), fuel oil, steam heating system.
5. Electrophoresis coating production line: cathode, anode, beat, automatic electrophoresis production line, etc.
Design and application advantages:
This project is a carbon steel shot blasting and powder spraying production line, mainly composed of powder spraying part, conveying system, solidification system and natural gas heating system.
This design fully considers the following aspects:
1. Ensure coating quality. The whole line is designed to be free of dust and residue, reduce the quality problem factor, and ensure the improvement of coating quality.
2. Ensure the advanced structure and reliable performance of the production line, and adopt the latest structure and latest patent technology under the economic and reasonable principle.
3. Give full consideration to energy-saving and cost-reducing technologies to reduce production and operation costs and maintenance costs.
4. Give full consideration to organic combination of advanced technology and reasonable investment.
The design features and new technologies of this production line are described as follows:
1. Automatic powder spraying, which is convenient and flexible and greatly improves production efficiency.
2. Pulse filter cartridges recovery system to make full use of powder, which greatly improves the utilization rate of powder.
3. The inner wall of the solidified oven is smooth, flat and free of dust. It is a straight-through structure. The inlet and outlet ends are provided with an air curtain device to reduce heat leakage.
4. Natural gas heating is adopted in the baking path, which is energy saving and environmental protection.
Item | type | PDAT1 | PDAT2 | PDAT3 | PDAT4 | PDAT5 | PDAT6 |
Painting width | mm | 800 | 1200 | 1500 | 2000 | 2500 | 3000 |
Chamber size | m | 0.8*0.16 | 1.2*0.4 | 1.5*0.4 | 2x0.4 | 2.5x0.8 | 3x0.8 |
Length | m | 1.2-6 | 1.2-12 | 3-12 | 3-12 | 3-12 | 3-12 |
Hook convey speed | m/min | 0.5-4 | 0.5-4 | 0.5-4 | 0.5-4 | 0.5-4 | 0.5-4 |
Thickness of steel plate | mm | 3-60 | 3-60 | 3-60 | 3-60 | 3-60 | 3-60 |
Air Volume | m³/h | 22000 | 17560 | 19000 | 19550 | 27758 | 28050 |
Packing: Equipments finish their painting and coating before delivery. Then they are wrapped with stretch film to protect the surface. Meanwhile we can use vibration-proof material in electric cabinet.
Shipping: Antai Heavy Industry has about 15 professional engineers and 108 technical workers. Such advantages ensure the delivery time. We have established long-term partnership with MSK and PIL. We could guaranty the goods delivered timely.
1.How many days do you need to produce this machine?
This is specially designed machine according to your specific requirement. From engineers designing to production completion, it needs about 45-55 days.
2.What does your factory do regarding quality control?
We pay much attention to quality control from the very beginning to the end. Each machine is assembled and carefully tested before shipment.
3.What’s your machine quality guarantee?
Quality guarantee time is one year. We choose world famous brand components to keep our machine in perfect working condition.
4.Could you give installation and commissioning overseas? How long will it take?
Yes, we supply overseas service, but customers need to pay for the engineers flight tickets and hotel, food.
Small machines usually takes 5 days, while big machines usually takes about 20 days.
5.How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order. The core of our company culture is innovation, quality, integrity and efficiency. Antai id ALIBABA’s golden supplier with BV and Tuv assessment. You can check with ALIBABA. We have never got complaint from our customers.
If the machine is not suitable for your work piece, please tell us the following information:
1)What kind of work piece will you clean?
2)The size of work pieces(length, width and height of maximum work piece,Length, width and height of minimum work piece?)
3)How many the weight of maximum and minimum work piece?
4)Please tell us your requirement cleaning efficiency?
According to your information, the most suitable machines will be designed for your work pieces.