The sandblasting Speed | 20-25/h |
Automatic Gun | 3pcs |
Manual Gun | 1pc |
Glass thickness | 3-50mm |
Power | 3.5KW |
Port | Qingdao Port |
Working Pressure | 0.6-0.8Mpa |
Compressed Air consumption | 22KW |
Abrasive Material | Aliminum oxide |
Customization | Available |
Product Keywords | High performance automatic glass frosting machine sandblasting machinery,Horizontal Glass Sanding Automatic Sandblasting Machine For Sale,2500mm vertical automatic glass sandblasting machine |
Automatic Glass Sandblasting Machine
Main Features:
1. Adopt touch screen operation,PLC control;
2. Automatic and manual both functions;
3. Adopt special material for nozzle that can be long life;
4. Automatically dust collection,adopt reverse blowing mode for filter bag dust cleaning;
5. Adopt input and output two conveyor belts that avoid to take the sand out;
6. Low cost for usage and maintenance.
Specifications
Model | RQ25LA | RQ20LA | RQ16LA |
Automatic Gun | 3pcs | 3pcs | 3pcs |
Manual Gun | 1pc | 1pc | 1pc |
The sandblasting Speed | 20-25㎡/h | 20-25㎡/h | 20-25㎡/h |
Max. Glass size | 2500*3660mm | 2000*3660mm | 1600*3000mm |
Glass thickness | 3-50mm | 3-50mm | 3-50mm |
Power | 3.5KW | 3.5KW | 3.5KW |
Working Pressure | 0.6-0.8Mpa | 0.6-0.8Mpa | 0.6-0.8Mpa |
Compressed Air consumption | 3m³/min 22KW | 3m³/min 22KW | 3m³/min 22KW |
Abrasive Material | Aliminum oxide | Aliminum oxide | Aliminum oxide |
External Dimensions | 6800*1500*3300mm | 6800*1500*2800mm | 4700*1500*2300mm |
Gross Weight | 1300kg | 1200kg | 1000kg |
Standard export carton packing.
3-20 days after confirming order,detail delivery date should be decided according to
production season and order quantity.
Having been over 10 years in this industry,we have got good reputation at home and abroad.And hope to build further business cooperation with our old and new customers.
We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.
After you pay the product charge and send us confirmed files, the machinery will be ready for delivery in about 15 days. The machinery will be sent to you via sea.
You can use your own forwarder or prepay us if you do not have an agent.
After you place a order,the production handling time is about 45-60 days.
We need 15 days to prepare all the stuff and manufacture it.
Normally we use shipment to transprot the goods.It is about 25-40 days.It also denpends on which coutry and port you are.It could be shorter if you need to send the goods like Asian.
If there are some emergencies we can send the goods via air express, as long as you afford the traffic expense.