Specifications of steel fire door | ||||
Material: | Cold-rolled steel panel | |||
Thickness of door panel material | 0.8-1.0mm | |||
Thickness of door frame material | 1.5-2.0mm | |||
Infilled material | quality perlite fireproof board | |||
Size: | size of door | Custmoised | ||
Thickness of door leaf | 5cm/6cm | |||
Depth of door frame | 95mm-110mm, | |||
Opening direction: | inward or outward opening(right/left) | |||
Surface finish | natural wood skin | |||
Door sill | Anti-rust steel painted/stainess steel | |||
Packing | Plastic film+standard export carton box or as customer need | |||
Container loading
QTY: |
For reference | 5cm(860mm/960mm) | 6cm(860mm/960mm) | |
40HQ | 375pcs/330pcs | 325pcs/296pcs |
Shipment and sample quality tracking includes lifetime. Any small problem happening in our DOOR will be solved at the most prompt time. We always offer relative technical support. Quick response,all your inquire will be replied within 12hours.
1.When did your company establish?
PHIPULO: Since 2000, we are a manufacturer with 15 years' experience.till now,we have about 500 worker
2.What is the capacity of production per day?
PHIPULO: More than 1500pcs.
3.Can I visit your factory?
PHIPULO:Of course! We are very welcome for your visiting, and we will pick you up at the YIWU airport or the railway station
4.Can customers order different colors and models in one order?
PHIPU.LO:Surely yes.Mixed colors and models are acceptable.One 20FT we suggest 2-3 models,one 40HQ we suggest 4-5 models
5.What’s your trade terms and payment term?
PHIPULO:Our trade term is FOB,EXW and CIF.Payment term is TT 30% depositS and balance before loading container.
6.What’s your special service?
PHIPULO:After finish production, we will send customers production photos. If no problem, then customers pay the balance: After finish loading container, we will send loading details and loading pictures for you reference
7.What’s your delivery port and delivery time?
PHIPULO:Our delivery port is Ningbo or Shanghai port in China .Delivery time is 25-30 days after 30% deposit received