NOTE: The specific mode of transportation, freight and delivery time shall be subject to negotiation and communication between the parties ! ! !
High-class Robotic Box Filling Robot Picking Machine for Shampoo Packaging
The carton packing machine is the core of the whole packaging line. The carton packing machine is a kind of equipment which can pack products into cartons according to a certain arrangement. This carton packing machine is fully automatic robotic carton packing machine, robot control the pneumatic gripping head of bottle to complete the horizontal movement and lifting movement to realize the carton packing actions.
SPECIFICATIONS FOR ROBOT PALLETIZER | |||
Robot arm | Japanese brand robot | Fanuc | Kawasaki |
German brand robot | KUKA | ||
Switzerland brand robot | ABB | ||
Main performance parameters | Speed capacity | 6s per cycle | Adjust according to products and arrangement per layer |
Weight | About 3000kg | ||
Applicable product | Cartons, cases, bags, pouch bags | Containers, bottles, cans, buckets bags etc | |
Power and air requirements | Compressed air | over 0.6 MPa | |
Electric power | 1-8 Kw | ||
Voltage | 380v | 3 phases |
PLC | Siemens |
Frequency converter | Danfoss |
Photoelectric sensor | SICK |
Servo motor | Panasonic |
Pneumatic component | SMC |
Low-voltage apparatus | Schneider |
Touch screen | Schneider/Siemens |
Driving motor | SEW |
1) Simple structure ,easy in installation and maintation.
2) Adopting advanced world famous brand components in pneumatic parts ,electric parts and operation parts.
3) When there is some change about the production line, just need to modify the software program..
4) Running in a high automatization and intellectualization,no pollution
5) Robert Palletizer takes less space and more flexiable ,accurate compared to the traditional palletizer.
6) Reducing a lot of labour and labour cost, more productive.
VALIDITY OF THE OFFER
30 days from the date of quotation sent
DELIVERY
Approx. 60 days from order confirmation
PAYMENT
30% as deposit by T/T, 70% paid before shipment by T/T.
INSTALLATION &COMMISSIONING
The seller will dispatch one engineer to the buyer's factory for installation and commissioning and training, the buyer should be responsible for the room and board and the go-back air tickets and visa fee, and the allowance of 100 USD per day for each person each day.
NOTE
1. If delays occur due to the fault of either party involved, then any extracost shall be borne by the party at fault
2. The Customer is responsible for providing continuous supply of quality electricity for the duration of the installation, commissioning and test running, which must be available prior to the arrival of technicians from the Manufacturer.
SAMPLES
Sufficient quantity of product samples must be sent byCustomers toManufacturerwithin 15 days after order confirmation for technical clarification.Delays in sending the required samples may affect the delivery schedule of the machines, of which the Manufacturer bears no responsibility for the cost of sending the samples is at Customer's charge.
GUARANTEES
√ The guarantee covers the replacement f.o.c. of the parts that are comprised in the supply and those
acknowledged to bear manufacturing faults or are materials that contribute to the incorrect function of
the machine
√ Lilan guarantees the products supplied for a 12-month period as of from the date of the startup but
however, not more than 18 months from the date of the relative invoice.
√ As for the electrical and electronic parts, the guarantee lasts for 6 months from the startup date but
however, not more than 12 months from the date of the relative invoice.
√ Merchandise that is supplied under guarantee will be delivered with pre-paid freight and packaging
√ Other relevant guarantees kindly see the operation and appliance manuals sent with equipment.
Note:All the accurate technical data should be confirmed in the meantime contract is confirmed