Enquiries
Message
Home > Products > Other
High Volume Prefab Steel Space Frame System Arch Coal Bunker Storage
  • High Volume Prefab Steel Space Frame System Arch Coal Bunker Storage

High Volume Prefab Steel Space Frame System Arch Coal Bunker Storage

FOB Reference Price
Purchase quantity ()
Minimum order quantity
Payment
Meorient Import & Export  Co.LTD
Meorient Import & Export Co.LTD
China - Hangzhou
Trading Company
Trade Capacity
Export Percentage
Nearest Port
Hangzhou,Shanghai
Accepted Delivery Terms
Employees
5-10人
Accepted Payment Currency
USD,CNY
Average Lead Time
45 Day(s)
Certifications
Product Specifications
--
Product Description
Overview
Quick Details
Standard:
AiSi
Grade:
Steel
Place of Origin:
Jiangsu, China
Brand Name:
TL
Model Number:
TL-CS22
Type:
Light
Application:
Structural Roofing
Tolerance:
±1%
Processing Service:
Bending, Welding, Decoiling, Cutting, Punching
Delivery Time:
22-30 days
Application Fields:
Steel Structural Fabrication Construction
Structure type:
Bolt Ball Joints Space Frame
Coating:
Paint
Coating Color:
Against Customer's Requirment
Certificate:
ISO9001:2008
Third Part Inspenstion & Test:
SGS / TUV / BV
Shape:
Barrel (Longitudinal)
Roof Cladding:
Corrugated Steel Sheet
Packing:
Steel Pallet
Installation:
Supervision
Supply Ability
Supply Ability:
5000 Ton/Tons per Month
Packaging & Delivery
Project Description
High Volume Prefab Steel Space Frame System Arch Coal Bunker Storage from China supplier
High Volume Prefab Steel Space Frame System Arch Coal Bunker Storage from China supplier
High Volume Prefab Steel Space Frame System Arch Coal Bunker Storage from China supplier
High Volume Prefab Steel Space Frame System Arch Coal Bunker Storage from China supplier
Specification
Item
Specification
Structural Type
Longitudinal Space Frame Structure
Main Frame
Steel Pipe
Q235 / Q355 Steel
Bolt Ball
45# Steel
Sleeve
Q235 & 45#
High Strength Bolt
40Cr
Secondary Frame
C-Purlin / Z-Purlin
Q235 / Q345, 250g/m2 galvanized layer, no painting on the surface
Enclosure System
Roof Panel
Color Steel Panel / Al-Mg-Mn Panel
(The colors&sizes of all panels can be customized as required.)
Accessory Structure
Door
Rolling Door / Sliding Door
Lighting System
FRP / PC / Window
Ventilation System
Louver / Ventilator
Drainage
Free Drainage
Others
Design Standard
American Standard / European Standard / Chinese Standard
Design Lifetime
Above 50 years
Fabrication
ISO Quality Control
Surface Treatment
Blast Cleaning Sa2.5 level, painting or galvanizing
(The thickness can be customized as required.)
Packing
Metal Frame for Large Components, Wooden Case or Metal Case for Small Components.
Or Bundling
Installation
Installation Guide
Space Frame Advantage
High Volume Prefab Steel Space Frame System Arch Coal Bunker Storage from China supplier
Our Service
TL commit to delivering cost-effective, customized steel building solutions that address and surpass our clients' expectations.Our rich project experience enables us to speed up the design and detailing process by eliminating overlapping tasks and working with an efficient integrated workflow.
Service Flow
High Volume Prefab Steel Space Frame System Arch Coal Bunker Storage from China supplier
Why Us
High Volume Prefab Steel Space Frame System Arch Coal Bunker Storage from China supplier
Design in accordance to Eurocode 4 & AISC 360-16
High Volume Prefab Steel Space Frame System Arch Coal Bunker Storage from China supplier
Detailing with Tekla & BIM to eliminating errors and speed fabrication drawing output.
High Volume Prefab Steel Space Frame System Arch Coal Bunker Storage from China supplier
Withstand powerful wind force up to 250KPH
High Volume Prefab Steel Space Frame System Arch Coal Bunker Storage from China supplier
Our structures are elaborately designed to provide extra reinforcement to resist hurricane damage and can withstand wind forces up to 250 KPH. The below pictures of wind-induced damage emphasizes the importance of steel structure design to minimize wind-induced damage to the building.
High Volume Prefab Steel Space Frame System Arch Coal Bunker Storage from China supplier
Our company has passed ISO 9001-2000 quality management system certification. Self inspection & test and the famous third party inspection are both carried out to ensure the outstanding quality.

Self-inspection & Test
High Volume Prefab Steel Space Frame System Arch Coal Bunker Storage from China supplier
Brand Material
We keep strategic partner relationship with BAOSTEEL, LAIGANG and RIZHAO Steel to ensure the excellent performance of raw material. Carbon is added to the steel during production to impart toughness to the steel. But adding more than the required amount in the greed of more strength make the steel brittle, and thus jeopardizing the life of the structure.
High Volume Prefab Steel Space Frame System Arch Coal Bunker Storage from China supplier
High Volume Prefab Steel Space Frame System Arch Coal Bunker Storage from China supplier
Steel coating comes in a variety of forms, all suited to specific environments. Painting, powder coating, hot dip galvanizing or a duplex coating system are all options that can easily provide long-term durability.
High Volume Prefab Steel Space Frame System Arch Coal Bunker Storage from China supplier

Paint

Paint is the most commonly used coating. Paint systems usually consist of primer, intermediate coat, and finish coat.
High Volume Prefab Steel Space Frame System Arch Coal Bunker Storage from China supplier

Powder Coating

Powder coating applies a powder material to steel sections using either an electrostatic or compressed air method. The powder is then cured (heated to its melting point) so that it flows to form a smooth film. This dries to provide a durable finish that is resistant to cracking, peeling, scratches, UV rays and rust. But compared to paint, powder coating is usually done in shop, so when powder coating is damaged, it is very difficult to repair as paint.
High Volume Prefab Steel Space Frame System Arch Coal Bunker Storage from China supplier

Hot Dip Galvanizing

Hot dip galvanizing is a process that involves immersing the steel component to be coated in a bath of molten zinc after pickling and fluxing, and then withdrawing it. The immersed surfaces are uniformly coated with zinc alloy and zinc layers that form a metallurgical bond with the substrate. The resulting coating is durable, tough, abrasion resistant, andprovides cathodic (sacrificial) protection to any small damaged areas where the steel substrate is exposed.
High Volume Prefab Steel Space Frame System Arch Coal Bunker Storage from China supplier

A Duplex Coating System

When hot dip galvanized steel is painted or powder coated, the duplex system provides a more sophisticated manner of corrosion protection known as the synergistic effect. Used independently, both paint/powder coatings and galvanizing provide corrosion protection to steel; however, when utilized together, the two coatings work in synergy to greatly extend structure life.
Easy & Fast Installation
TL's assembly process ensures a fast, safe and easy installation at every job site. With TL's on-site expert guidance, our structures are installed with locally-sourced labor. All of the structure’s connections are mechanical, so no welding is required.

High Volume Prefab Steel Space Frame System Arch Coal Bunker Storage from China supplier


Installation Steps of Longitudinal Space Frame
High Volume Prefab Steel Space Frame System Arch Coal Bunker Storage from China supplier
1) Half arches are pre-assembled on a project
High Volume Prefab Steel Space Frame System Arch Coal Bunker Storage from China supplier
2) Half arches will be joined together to form a rib
High Volume Prefab Steel Space Frame System Arch Coal Bunker Storage from China supplier
3) Half arches are joined together to form a rib
High Volume Prefab Steel Space Frame System Arch Coal Bunker Storage from China supplier
4) Assembly in air
For Precise Quotation
More details given to us will help work out precise quotation.
No.
Item
Specification of Project
Remarks
1
Project Location:
 _____ Country, Area
Project Size:
 L: ___m W: ___m H: ___m / Dia. ___m
Buidling Shape:
 Flat / Dome / Arch / Irregular
2
Wind Load:
 ____kn/m2, ____km/h, ____m/s
Snow Load:
 ____kn/m2, ____km/h, ____m/s
Seismic Load:
 ____kn/m2
Live Load:
 ____kn/m2
Dead Load:
 ____kn/m2
3
Surface Treatment:
Painting / Galvanizing / Powder Coating
4
Roof Materials:
Color Steel Panel / Sandwich Panel / FRP Daylighting Panels / Glass
5
Design Standard:
GB / ASTM / BS / EN / Other
Related Projects
No desirable products?
Sourcing assistant>
How to start your business
  • Step 1
    Find your interested products by search keywords
  • Step 2
    Contact the supplier by clicking ”Enquire” or “request meeting” button, otherwise, you also could consult our import consultant.
  • Step 3
    After verifying your email, get response from suppliers or our trade manager will contact you as soon as possible
  • Step 4
    Set up meeting with the Chinese supplier without language barrier
Send Enquiry
ToLily Liu
Meorient Import & Export Co.LTD
Enquire
Popular Searches
lathersbuchertether.thermosatherosfortherusherfinetherhb thermfortherthoraether.thermoslocherfletcher