High Quality Temperated Glass Making Machine Forced Conventional Tempering Furnace
FEATURE:
1. Glass thickness range : Tempering : 4 - 19 mm with tolerance +0.2/-0.2mm
2. Glass size:
Flat tempering Glass size:
Max flat glass size : 2000mm x 2500 mm
3. Finished product rate: over 5mm not less than 98%.
4.Productivity / Process cycle time: 5 mm = 16-18 loads / hr
5.Utilities
Installed power:
Heating :750 kW
Drives : 17 kW
Flat Quenching : 250KW
Power requirement: Transformer no less than 800KW
Note: The power capacity may be different and should be referring to the actual
6.Compressed air(an air tank should be supplied with 0.5M3 at least) :
Volume: 0.6-0.8m3 /min
Pressure : >0.7 MPa
7.Suitable glass sorts:
Clear float glass
Coated glasses (Including most kinds of hard coated glass, parts of special soft coated glass, which withstands about temperature 700 ℃)
Patterned glass
Tinted glass
8.Supply Scope
-- Loading table
-- Heating section (furnace)
-- Flat Quenching section
-- Unloading table
-- Associated electrical and control equipment
-- Remote diagnosis system
-- Control terminal
--250KW inverter*1
9.Main configuration:
1). Industrial computer is the advanced original ADVANTECH product from Taiwan.
2). PLC: OMRON product from Japan
3). Temperature control: original ADVANTECH product from Taiwan
4). Photoelectric and proximity switch: OMRON product from Japan
5). Drive Inverter(≤10kw): Schneider
6). Drive motor: Taiwan
7). SSR: Starnberg
8). Control loop and the low-pressure main loop: Schneider
9). Cabinet outside coder and photoelectric switch, proximity switch: OMRON
10). Material of heat preservation: YESO
11). Blower: China
12). Ceramic rollers: SINOMA/KAMROLA
13). Monitor: Dell.
Samples:
Before payment
Free contact for the most suitable machine
Free professional design for each customer especially.
After sale service
24 hours technical support by phone, email or skype (email or skype) .
1years warranty period
Our senior engineer is available to travel aboard, help the installation, maintenance and training staff.
By offering this support, we make sure the cutomer start the business smoothly, to realise win-win cooperation.
Payment
♦ L/C, 30% deposit by T/T,70% spare payment L/C.
♦ T/T, 30% deposit by T/T,70% spare payment before shipment.
♦ Western Union or Paypal.
1. When can we arrange shippment?
We usually arrange shippment within 15 days after getting deopsit,
but customized machines should be more than 25 days.
2.What you can do if my machines have problems?
1) We can send you free components to you if your machines are in guarantee time.
2) We can send our engineers to repair your machines
3.Do you provide equipment operation training?
A: Yes. We can send professional engineers to the working site for equipment installation, adjustment, and operation training. All of our engineers have passport.