Feature of our potato planter used:
Our Advantage:
1.It can according to the requirements in different parts of the agricultural planting, adjust depth, spacing and planting distance.
2.This machine can be used with 15 ~ 35 horsepower four-wheel tractor, has compact structure, good mobility, reasonable layout, work steady, strong adaptability, easy maintenance, etc.
3.According to the size of the power of the tractor, the combined group. Productivity per hour 5 ~ 8 acres, can be a one-time furrowing, fertilizing, seeding, covering operations.
Our Feature:
1.Suitable for all kinds of soil, And can achieve the agronomic requirements.
2.Seeds triangular arrangement, reasonable use a space, for production and grow up.
3.With compact structure, good mobility, reasonable layout, smooth, strong adaptability, easy maintenance, etc.
Specification of our potato planter used:
Product name | Double rows potato | Double rows potato |
Model | SM-PP-A | SM-PP-B |
Overall dimension | 1500*1140*1500mm | 1600*1300*1350mm |
Row spacing | 51cm | 50-85cm |
Planting distance | 32cm | 25-33cm |
Total weight | 280kg | 230kg |
Productivity | 0.4-0.6 km2/h | 0.4-0.6 km2/h |
Seed tank capacity | 0.4m³ | 0.48m³ |
Manure tank capacity | Without fertilizer tank | 0.08M3 |
Power required | 20-50HP | 20-35HP |
Potato cups | 6cm | 5cm |
Number of cups | 19*2 | 14*2 |
Packing size | 1600*900*1000mm | 1800*900*600mm |
Application of our potato planter used:
1.This machine is composed of such componentes as land wheel,rack,ditcher seed metering device seed box fertilizer box, covering the seed and so on.
2.The whole machine is connected to the rear of tractor by its three point linkage.
3.During processing of operation,the planting machine is pulled forward by the tractor,and seed metering is finished by the speed changing of fertilizer into the furrow and the earth-filling device levels the land.Therefore,the whole set of working procedure is finished.
Detailed pictures of our potato planter used:
Standard export carton or wooden case packing.
3-20 days after confirming order,detail delivery date should be decided according to
production season and order quantity.