Size | 500*500/600*600 |
Thickness | 30/35/40mm |
Certificate | ISO9001 |
Finish Material | PVC.etc |
Color | grey |
Application | Data centers |
Product Keywords | Heavy Duty steel antistatic Raised Floor for data control room computer room |
Description:
Designed specially for computer & equipment room with HPL/PVC laminates ,etc which have been throughly tested. The finish has many different colors, and has an electrical resistance range of 2.5×104 to1×106 ohms or 1×106 to 2×1010ohms(when tested at 20%RH)
It is classified as two types,one is with black edge,the other is without black edge.The outside of the raised floor is made of high quality zinc cold steel sheet,the top is superior zinc cold steel sheet of Shanghai Baosteel,and the bottom is superiorly deep-strech zinc cold steel sheet .Advanced spot welding technical structure is applied to the top and bottom of the raised floor,and in the middle is filled with lightweight cement of special ingredients.In this way,the fnished products feature high strength and durability.
Feature:
1).Designed specially for computer room, control rooms,etc
2).The raised floor consist of following parts"
a)30mm or 35mm thickness cement core panel
b)4 pieces of black PVC stripps along the side of panel
c)Covering:HPL /PVC /Ceramic
d)pedestal,stringer,screws
3).Light cementitious fill makes panel solid and quite
4).Completely non-combustible;class a flame spread and smoke development rating
5).Easy and quick accessibility, resist pollution, easy to clean, durable
Application:
Be applied in all kinds of computer rooms widely,especially in school's computer rooms such as in multimedia classrooms,computer rooms,etc.
Installation And Maintenance:
1.Requirements to laying site:
1)The laying of antistatic raised access floor shall be carried after the indoor civil engineering and decoration and finished.
2)Ground must be flatness,clean,dry and there shall be no any sundry or dust on it .
3)The construction of cable electric appliance,air pipeline and AC system to be arranged under floor surface shall be finished before the installation of floorings.
4)The base of heavy equipment must be firmed,equipment is installed on the base and the base height shall be align with the upper surface of the floor.
5)The construction site must be equipped with 220V/50HZ power supply and water supply.
2. Tools for installation:
Infrared ray level instrument, large push cutter, aluminum alloy ruler, level bar electric hand drill, Mini type marble cutter, pulling nail gun, wire-cutter, steel ruler, nail, pencil, suction disc machine, adz-eye hammer, spanner, screwdriver, floor glue, tool bag ,broom.
3. Construction Procedures:
1)The flatness of floor and the verticality of wall are carefully checked. If any part is found not to be consistent with construction requirements,it shall be reported to relevant department of Part A.
2)The horizontal lines are pulled and fixed and the installation height of floorings is drawn on the wall using ink line.The floor panels shall be on a same horizontal plane. The indoor length and width are measured. The reference position of laying shall be selected properly in order to decrease the cutting the floorings.
3)The pedestals to be installed are adjusted to a same height as required,and then placed on the decussation position of the grid lines.
4)Stringers are fixed on the pedestals using screws, and every are on a same plane and mutually perpendicular.
5)The floor replaced on the assembled stringers using board sucker.
6)If the rest distanceto the wall is less than the length of floor , the floor can be cut into adequate size before installation.
7)During the laying of floorings,blister gradienter shall be used for levelling and the height of floorings can be adjusted through pedestal.
8)In case that heavy equipment is placed in machine room,additional pedestal shall be installed under the equipment base in order to avoid the deformation of floorings.
9)If it is necessaryto cut or open hole on the raised floor,electrical drill shall be used to open in order to avoid the rupture of veneer.
3. Acceptance criteria for the laying of floorings:
1)Either under the floor or the surface of the floor shall be cleaned,to avoid the dust .
2)There is no search and coating peeling on floorings,and regulas are not damaged.
3)The whole of the floor after laying shall be stable and firm. There is no sound and the feeling of shaking when walking on the floor.
4)The regulas must be in a line,and the displacement of adjuacent regulas shall not be more than 1mm.
5)The height difference of adjacent floor panels shall be more than 2 mm.
4.Maintenance Requirements:
1)It is forbidden to directly use sharp tools to carry out construction on the floor surface in order to avoid the damages to the appearance and antistatic performance of flooring surface.
2) During application, no person is allowed to jump onto the floor from high position, and it is forbidden to crudely remove equipment as such operation may damage the floor.
3)When equipment is moved on the antistatic raised access floor,it is forbidden to directly pull the equipment on floor as it may scuff the floor,the equipment shall be lifter before moving.
4)When heavy equipment is to be installed in machine room,it ahall directly place the heavy equipment on floor as deformation may be long-term load bearing.
5)To repair the equipment under the floor, panel lifter shall be first used to remove flooring.It is forbidden to use sharp tools to crudely dismantle and assemble the flooring.
6)During maintenance,dust collector or mop can be used to keep the floor clean. Particularly, measures shall be taken to avoid sprinkling liquid onto floor.
7)Antistatic wax can be polished on the floor surface, in order to protect the floor and ensure the application effect in long time.
5.Opetaing Environment:
The temperature in the room to be laid with antistatic raised floorings shall be 15-35degree,and the relative humility is 45%-75%RH.If the humidity of the computer room is low for a long time,there may be cracks on the floor surface and the strength and the thickness of attaching veneer shall be increased therefore.
Our Services:
Whether you choose us or not finally,any questions about the raised floor systems you can feel free to ask us.We will take all our customers as our best friends ,so the best services will be provided at any time.
Uusally the anti-static raised access floors are shipped by 20ft containers, as the floor is heavy ,about 12-16kg per pcs. 20ft container can ship the raised floor and accessories about 500 square meters .
5-20 days after confirming order,detail delivery date should be decided according to products types and order quantity.
Changzhou Basic Computer Room Equipment Co.,Ltd is an export oriented access floor manufacturer with design, producing and installation. Basic has been certificated in ISO9001, ISO14001 Enviroment System.
Basic covers an area around 30,000 sqaure meters. And more than 200 workers are working in factory now. Basic’s major products include OA Intelligent Building Access Floor Series, Anti-static Steel Access Floor for Computer Room, Conductive Vinyl Tiles for Clean Room,Steel Perforated Floor,Calcium Sulphate Access Floor, Woodcore Panel and Electrical Floor Box.Our annual production capacity is more than 1.2 million square meters. Products manufactured by Basic has been exported to over 20 foreign countries, such as Canada, Singapore, Taiwan, Brazil, Africa and Middle East,etc.