TiN titanium nitride coating equipment
pvd titanium gold coating equipment
Vacuum metal gold plating machine
This is a ion coating machine of efficiency, harmless and pollution-free. It has the features of fast deposition rate , great ionization rate, big ion energy,easy operation, low cost, large productive capacity, etc.
Characteristic: The principle of the electric arc is integrating cold cathode arc discharge self-sustained light unite pulse technique and magnetron sputtering technology, thinning the particles to improve the properties of the film. It can coat on the surface of the metal as well as nonmetal.
Films classified with colors
Imitation gold series: TiN, ZrN, TiN+Au, ZrN+Au
Rose Gold Series: TiCN, TiAlN, TiCN+Au--Cu, TiAlN+Au, Cu
Silver white series: CrN, CrSiN, Zr (micro N)
Grey series: Ti, stainless steel (S.S), (S.S) N
Coffee color series: TiCN, TiAlCN, ZrC
Blue series: TiO, CrO, TiALN
Black Series: TiC, TiC+iC, TiCN, TiAlN, TiAlCN, Ti (C, O) and DLC
Applied industry: It can be used to coat metal film, titanium nitride, titanium carbide, and zirconium nitride, chromium nitride and titanium, nickel, chromium, copper , and other compounds film, multi-layer super-hard film, nitrogen-doped titanium film and the alloy film, and in a very short time to complete all the machining process, it is a highly efficient multi-functional coating equipment.
This machine is extensively used in the fields of ultra-hard coating about the tools and mould, decorative coating about car wheels, ceramics, golf, watches making, hotel product, sanitary ware, luminaires, optical frame, hardware, etc .
Technical parameter:
Mode Dimension |
LH-800 |
LH-1250 |
LH-1416 |
LH-1618 |
800*1000mm |
1200*1500mm |
1400*1600mm |
1600*1800mm |
|
Coating mode and main confirguration |
Eight multi-arc targets |
Twelve multi-arc targets |
Fourteen multi-arc targets |
Twenty multi-arc targets |
Power source |
Electric-arc power, Filament power, Pulsed bias power supply |
|||
Process gas control |
Mass flowmeter + Electromagnetic ceramic valve |
|||
Vacuum chamber structure |
Vertical side opening door, pump system postposition, double water cooling |
|||
Vacuum system |
Molecule pump +Roots pump +Mechanical pump(5.0*10-5Pa) Diffusion pump +Roots pump +Mechanical pump(5.0*10-4Pa) |
|||
Workpiece baking temperature |
Normal temperature to 350 centi-degree PID control, radiation heating. |
|||
Workpiece motion mode |
Public rotation Frequency control: 0-20 rotation per minute |
|||
Measure mode |
Number display composite vacuum gauge: from atmosphere to 1.0*10-5Pa |
|||
Control mode |
Manual/Automatic/PC/PLC + HMI/PC four choice of control mode |
|||
Remark |
We can design the dimension of the equipment according to customer’s special technique requirement. |
We can design the dimension of the vacuum chamber according to your requirements. We can also design and configure the vacuum unit and electric controlling system according to your requirement.
This is our machine:
Machines running in our customer's factory:
Samples coated by our machine:
(Titanium coating)
Stainless steel deep black coating(sputtering coating)
Titanium gold decorative coating
Decorative coating on mosaic tile:
Decorative coating on brass:
Gold and silver coating on ceramic
Decorative coating on steel parts
· Over 3000 plants installed worldwide
· Quick cycle times
· High production capability with low energy consumption
· More up time due to ease of loading/unloading and low maintenance
· High productivity with only a single operator
· Steel process chambers, built to last
· Eco-friendly
· Space saving design
· PVD option available on all plants
· 1 year component warranty and 25 years minimum guaranteed working life
· Complete global network of consulting, engineering and renowned after sales service
We developed a complete after-sales system and effective service measures. Company now owns a professional after-sales service team with more than ten experienced engineers.
HCVAC can help you to enter the PVD coating easily by our vacuum coating machine and full range service. We will provide with most suitable technology according to your requirements.
We will make the full set special coating solution for each customer; combine the full set production technics to meet your requirements, to ensure high efficiency of production.
ISO 9001 standard to ensure the quality can meet the customer’s requirements.
Easy to implement
To many people unfamiliar with the process, PVD coating technology seems complicated. However, with the right investments and a good support, it is easier than expected. HCVAC has developed a turnkey coating process that makes a PVD coating centre easy to implement. A complete coating process consists of several steps: stripping (depending on the part’s history); pre-treatment; quality control; cleaning & drying; fixturing & visual inspection; PVD coating; quality control & thickness measurement and post-treatment (depending on the application). These steps are all available from one partner: HCVAC Technology, including mature technics and coatings.