Dissolved gas tanks produce dissolved water, which is released to the water to be treated by the decompressor. The air dissolved in the water is released from the water to form tiny fine bubbles of 20-40um. The microbubbles are combined with the suspended matters in the sewage, so that the specific gravity of the suspended matter is smaller than that of water and gradually floats to the surface to form scum. A scraper system is provided on the water surface to scrape scum into the sludge pool. The clear water enters the clear water tank from the lower part through the overflow tank.
Model | Capacity(m3/h) | Dissolved air water valume (m3/h) | Shaving foam machine power(KW) | Apprearance size(mm) |
JXPF-5 | 4-5 | 1.5-2 | 0.55 | 3000*2200*1900 |
JXPF-10 | 8-10 | 2-3 | 0.55 | 4000*2200*2400 |
JXPF-15 | 10-16 | 3.5-5 | 0.55 | 4500*2200*2400 |
JXPF-20 | 15-21 | 5-7 | 0.55 | 5000*2700*2400 |
JXPF-30 | 20-30 | 6-10 | 0.55 | 6000*2700*2400 |
JXPF-40 | 30-40 | 8-13 | 0.75 | 6000*3100*2400 |
JXPF-50 | 40-50 | 15-20 | 0.75 | 6500*3100*2400 |
JXPF-60 | 50-60 | 18-27 | 0.75 | 7000*3100*2600 |
Shandong Jixu Environmental Engineering Co.,Ltd. Is located in various cities in Shandong Province, east of the coastal city of Qingdao City, south of Pi Xinxing port Rizhao City. The company mainly engaged in: biological wastewater treatment technology research and industrial application, municipal and industrial wastewater treatment research and development and production of complete sets of equipment, etc.
1)We can provide design solutions.
2)We can provide quotqation soon.
3)We will reply in 2 hours.
1)We can provide solutions for any problem within 1 years.
2)If you need to replace parts, we can provide cost-priced accessories
3)We will provide installation video
A:You can provide us your water sources, water quality, flow rate and ground area (connect us for more details).
A:TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
A:It depends on order quantities. Generally speaking, the delivery time will be within 3 to 5 weeks.
A:We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
A:We use the world-famous paint, like epoxy-coal tar pitch etc. What's more, we paint strictly according to the standard process.
A:We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you.