steel keel for dry wall partion keel ,the steel keel was produced by galvanized steel.
1.Galvanized Steel Profiles raw material is high quality hot dipped zinc galvanized steel strip, absolute damp proof , heat insulation and high durability , high rust resistance.
2. Zinc coating is 80-140g/m2.
3 Stud&track uses the high quality cold rolled continuous hot galvanized plate as raw materials which makes sure it is anti-corrupt and anti-rusty
4. Product adopts excellent manufacture equipment,advanced production process,scientific and detecting method
5. Package: 10 pcs/bundle with plastic strip or iron wire
6. Delivery time: T/T, within in 10-25 days after receiving 30% deposit
Raw material: 2mm Cold Roll Coil
Zine coated progress is contrl by our own factory
Zine Coated Level: 60g~200g
Thickness 0.4~1.2mm
Tensil Stress: 696.74MPa
Yeild Stress 669.48 Mpa
Hardness: 15HRC
Standrard GB/T 11981-2001
1.Galvanized Zinc coating will protect the channel from being rust;
2.Flexibility of application makes each ceiling tile/plasterboard easily installed and disconnected;
3.Size adjustability can easier to match your request;
4.High quality leads longer life span & higher strength;
5.Better function of dealing with both high tensile stress and blending stress.
Easy and fast for installation,time-saving
1.To fix the ceiling track and the floor track to the clear ceiling and the clear floor with the shoot-nails.
2.Install the metal stud to the ceiling track and the floor track, and use the rivets to fix them in accordance with the design space.
3.The gypsum boards should be installed to the frame with the tapping screw, when the whole frame is formed .
4.One-layer gypsum board is used , the space between two gypsum plaster boards should be staggered. And the double-gypsum board is used the space between two gypsum plaster boards should also be staggered.
5.Joint putty process the final decoration can be done.