Gardner Denver Emsco BomcoPZ 9 PZ11 Mud Pump valve assy with insert valve seat
Our company supply Gardner Denver Emsco BomcoPZ 9 PZ11 Mud Pump valve assy with insert valve seat
all are heat treated with high strength, and digital machined. Our products are all of high quality, with full sizes, and long service life.
We can supply a full range of Gardner Denver Emsco BomcoPZ 9 PZ11 Mud Pump valve assy with insert valve seat. It is easy for installation and with high mechanical performance.
Mud pump types
brand |
type |
||||||
emsco |
F-350 |
F-500 |
F-650 |
F-800 |
F-1000 |
FA-1300 |
FB-1300 |
FA-1600 |
FB-1600 |
|
|
|
|
|
|
gardener denver |
PZ-7 |
PZ-8 |
PZ-9 |
PZ-10 |
PZ-11 |
5*6FG-FXG |
5*8FD-FXX |
national |
7-P-50 |
8-P-80 |
9-P-100 |
10-P-130 |
12-P-160 |
|
|
ideco |
T-800 |
T-1000 |
T-1300 |
T-1600 |
|
|
|
oilwell |
A-350 |
A-560 |
A-650 |
A-850 |
A-1100 |
A-1400 |
A-1700 |
china |
3NB-350 |
3NB-500 |
3NB-800 |
3NB-1000 |
3NB-1300 |
3NB-1600 |
3NB-2200 |
Goldenman Petroleum Equipment Co.,Limited (hereinafter as Goldenman) is located in Dongying City, which is famous for Shengli Oilfield and the largest manufacturing hub of petroleum equipment in China.we supply drilling equipment from 2006.
Goldenman is a professional supplier of various oilfield equipment, including oil drilling and service equipment,oil production equipment ,mud pump & spare parts ,wellhead & downhole tools and spare parts with API certification.
Goldenman hasestablished a complete quality control system, all products&
Equipment manufactured as per international standard and API standard.
plywood case for
Gardner Denver Emsco BomcoPZ 9 PZ11 Mud Pump valve assy with insert valve seat
Q1. Whether accept customized according to customers' requirements ?
A: Yes, We accept customized, no matter how much is the purchase quantity
Q2. Can I expect a quality products?
A: Yes. All our activities are accredited to ISO 9001:2008 and API, both in products
and services, at the same time, mature production technology ensuring the quality satisfy international request.
Q3. About lead time and shipping time?
A: The lead time depend on quantity of order. Usually shipped by sea, small order
or urgent order we can send you by air after received your agreement.
Q4. What is your trade terms?
A: We offer EXW, FOB, CFR, CIF, DDU.
Q5. What is your payment terms and method?
A: Our payment terms: normally 30% deposit, balance 70% before shipment.
Our payment method, we accept T/T, L/C.