2018* 70MM width galvanized steel wall partition
Name | 2018* 70MM width galvanized steel wall partition |
Brand |
NEW TOUR |
Material |
Galvanized Steel |
Packing |
5 pieces a bundle or as your requirements |
MOQ |
100Square meter |
Payment |
T/T, Western union, Cash |
Delivery time |
Usually one week |
Advantages of drywall metal stud and track |
1.Sound absorption coefficient more than 0.8 |
2.Fire proof performance :Stage B1 | |
3.Thermal conductivity less than 0.003w/M.k | |
Features of drywall metal stud and track |
1.Sound absorption, decoration, heat preservation, fireproof |
2.environmental conservation, easy machining, stability, | |
3.impact resistance, maintenance convenient, anti-corrosion, moisture proofing | |
4.Used in sound absorption, thermal insulation, wall decorations in Hotel, | |
5.Exhibition hall, School, Cinema, Boat casting station, Concert hall,Studio, | |
6.Movie theaters, Prison hall room, Conference room, Hall,KTV rooms, | |
7.Singing and dancing hall, Office Music college and so on | |
Applications of drywall metal stud and track |
1.Used in sound absorption, thermal insulation, wall decorations in Hotel, |
2.Exhibition hall, School, Cinema, Boat casting station, Concert hall,Studio, | |
3.Movie theaters, Prison hall room, Conference room, Hall,KTV rooms, | |
4.Singing and dancing hall, Office Music college and so on |
Tell you how to installation
ONE: drywall metal stud and track --- Hanging drywall
1. | Finish all the electrical, plumbing and insulation work that is necessary in your
walls before you begin to install any drywall.
|
2. | Mark the location of the wall studs on both the floor and ceiling, so you will be
able to find them when you begin installing the sheet rock. |
3. | Lay a piece of scrap on the floor to raise the drywall off the floor (about 1/2 inch).
|
4. | Starting in a corner, place the drywall onto the scrap and butt it into the corner. Ensure the other end of the sheet falls onto the center of a wall stud. (Sheets can be installed either vertically or horizontally. Most pros like to install it horizontally, since this means fewer joints to fill and the main seam is about four feet off the floor - a comfortable height to work at.)
|
5. | Use drywall nails or your drywall gun and drywall screws to fasten the sheet in a couple of places to hold it. Now go back, and starting in the corner, push the drywall sheet tightly against the wall studs and fasten the sheet to all the studs it is covering. Place screws every 6 to 8 inches.
|
6. | Continue around the perimeter of the room, butting sheets against each other, ensuring the ends are centered on wall studs, until the lower section is finished.
|
7. | Measure from the top of the bottom sheet to where the top of the wall will be (this will be the height of the top piece of drywall). If the distance is less than 4 inches, cut the drywall sheet to the proper height and install it with the cut edge at the top.
|
8. | Continue installing the top row all around the room. |
TWO: drywall metal stud and track --- Cutting drywall
9. | Measure and mark where you want to cut the drywall. Use a straight edge or a chalk line to join the marks. Always mark and cut on the front side of the panel.
|
10. | Using a sharp utility knife, score deeply along the cut line.
|
11. | Stand the panel on edge and snap the cut section back.
|
12. | Finish by cutting through the paper on the back with your utility knife.
|
THREE: drywall metal stud and track --- Cutting around outlets
13. | Measure from the edge of the outlet box to the edge of the panel and mark it. Now measure from the floor to both the top and bottom of the box and mark the panel. You should now have the outline of the box marked on the drywall.
|
14. | Drill holes at the corners and then, using a drywall saw or a keyhole saw, cut the opening for the box.
|
FOUR: drywall metal stud and track ---Finishing drywall joints
15. | Use a 6 inch taping knife to fill tapered joints (factory edge to factory edge) with a thin layer of joint compound (mud).
|
16. | Center the drywall tape over the joint and run your knife along the tape, pushing it into the mud.
|
17. | Cover with a thin layer of mud and let dry.
|
18. | After the mud has dried (overnight), us a 12-inch taping knife to apply a 10-to-12-inch wide coat of mud, feathering or smoothing out the edges, and allow it to dry.
|
19. | Apply the final coat of mud by thinning it slightly with some water and spreading a light coat over all the taped sections. Let it dry.
|
20. | Sand the wall lightly in preparation for painting.
|
21. | Follow a similar process (but using less mud on the first coat) for joints where cut edges butt against each other.
|
22. | Finish inside corners by putting mud on both sides of the joint, folding the tape in half and then pressing it into the seam.
|
23. | Attach metal corner beads to outside corners by nailing through the corner bead into the underlying stud and applying mud over the bead.
|
We are a professional manufacturer of gypsum/Plaster products, specialized in gypsum board, all metal accessory for ceiling and wall partition system. Located in Guangzhou city. Our products are reinforced, light-weight, non-distortion and environmental.
All products we do:
1 | Paper faced gypsum board & PVC gypsum ceiling board &
water-proof gypsum ceiling board |
2 |
Gypsum cornice, Plaster cornice, Gypsum Plaster cornice moulding
|
3
| Aluminum and false ceiling |
4
| T grid suspension system |
5
| Drywall for ceiling and for partition. |
Here is all product we do now