Raw materials | Aluminium alloy 6061-T6 |
Size | Customized and design according to project drawings |
Safe working load | 60KN/m2 |
Surface treatment | Powder coating |
Panel thickness | 4mm |
Frame thickness | 8mm |
Performance | One-time monolithic pouring |
Production capacity | 120,000m2/month |
Certification | RoHS, ISO 14001:2015, BizSafe, BCA-BAND 2 |
Application | Concrete pouring for wall, Slab, Column, Beam, Staircase |
Quality of formwork | The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won’t be wasted. |
FAQ
Q1: Can I use this set of formwork to another project?
A:yes, there are nearly 70% standard panels can be common used.
Q2: What's your packing methods?
A: protection foam+heat contract contracted plastic film./wooden packing (non-fumigation)/Metal pallet or depend on client special requirement.
Q3: What's your payment terms?
A: T/T 30% in advance and T/T 70% upon sending the copy of Bill of Lading, L/C 100%,or negotiate according to the order status.
Q4: Are you manufacturer or trader?
A: We are the manufacturer of aluminum formwork system for 9 years. Our group has 5 factories, coveraged every scaffolding systems.
Q5: If I don't have people know well about your formwork system, what can I do?
A:Well, we will send two or more technicists to your construction site for guidance.
Q6: Do you have pre-mocking up service?
A: yes, we have pre-mocking up services, and it depends on customers. Sometimes our clients need the cargo urgently, then they do not need pre-mocking up. Normally, we do pre-mocking up to our customers.
Q7: How to proceed an order for aluminum formwork?
A: 1. Receiving all drawing from the customers. 2. Analyzing the project by our engineer and designer, and discussing the details. 3. Confirming construction details , and? signing the contract. 4. Modeling 5. Having a meeting to confirm model details. 6. Production 7. Acceptance check 8. Ship