Online support, Video technical support, Field installation, commissioning and training, Field maintenance and repair service
Certification:
CE, ISO, SGS
Product Name:
Drinking/Mineral/Pure Water Rinsing-Filling-Capping Machine
Bottle Type:
PET Plastic Bottle
Capacity:
5000BPH-36000BPH
Filling Volume:
200ml-2000ml
Filling Principle:
Gravity Filling
Filling Accuracy:
±5%
Material:
SUS 304/316L
Structure:
Rotary Rinser-Filler-Capper 3-in-1
Filling Valve Head:
Multi-head
Dosing Device:
Surface Type
Supply Ability
Supply Ability:
30 Set/Sets per Month
Packaging & Delivery
Products Description
XGF 3-in-1 filling monoblock, combined with rinsing, filling and capping. It is innovated and designed in the requirement of still pure water and mineral water, on the bases of introducing, digesting and absorbing advanced technology from Germany and Italy.
Bottle Infeed
1. Bottle infeed by combination of infeed satrwheels
2. Equipped with bottle jam protection device.
Rinser
1. Fully stainless steel welded structure.
2. Driven by driving system positioned insidemachine frame via gear transmission.
Transfer Starwheel
1. Made of stainless steel of superior quality.
2. Equipped with bottle jam protection device.
Filler
1. Gravity filling method.
2. Level of cylinder is controlled with float-ball.
Capper
1. Equipped with inlet bottle detection switch.
2. Cap distributing chute is equipped reverse cap stop and reverse cap pick-out mechanism.
Discharge Starwheel
1. Nylon starwheel and conveyor belt work together to discharge bottles.
Q1: which city are you in? how can I get to your factory? Are you a trading company or factory? A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 10 years experience.
Q2: Why is your prices higher than others? A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.
Q3: What is your delivery time? A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.
Q4: How to install my machines when it arrives? How much the cost? A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If needed.Or you can arrange engineers to study in our factory. You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.
Q5: How long time for installation? A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.
Q6: How about the spare parts? A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units tosave international courier such as DHL, it is really costly.
Q7: What is your guarantee? A7: We have one year guarantee and life-long technical support. Our service also including machine maintence.
Q8: What is your payment term? A8: 30%T/T in advance as down payment, rest should be paid before shipping. L/C is supported also.
No desirable products?
Sourcing assistant>
How to start your business
Step 1
Find your interested products by search keywords
Step 2
Contact the supplier by clicking ”Enquire” or “request meeting” button, otherwise, you also could consult our import consultant.
Step 3
After verifying your email, get response from suppliers or our trade manager will contact you as soon as possible
Step 4
Set up meeting with the Chinese supplier without language barrier